<font color=blue>''' February 20 swing, February 21 owl and day shifts Run Plan'''</font> | <font color=blue>''' February 20 swing, February 21 owl and day shifts Run Plan'''</font> | ||
− | + | <!-- | |
* Take data with a production trigger trigger_v4.trg untill 1 PM Wed. Feb. 21, and at 1PM call MCC and request "Restricted" access. | * Take data with a production trigger trigger_v4.trg untill 1 PM Wed. Feb. 21, and at 1PM call MCC and request "Restricted" access. | ||
** HV on all detectors should be off, except SVT you can turn HV off, for SVT call Yuri and ask to turn SVT HV off | ** HV on all detectors should be off, except SVT you can turn HV off, for SVT call Yuri and ask to turn SVT HV off | ||
Line 134: | Line 134: | ||
* Next step is to tur HV on for detectors, for '''SVT''' only call Yuri and ask him to turn SVT HV on. | * Next step is to tur HV on for detectors, for '''SVT''' only call Yuri and ask him to turn SVT HV on. | ||
* Sergei has added a new component PCal Ustrips (PCU) in the trigger, it's timing should be checked, call sergei and ask him to take over the DAQ to adjust the relative timing of PCU. This should approximetely take about 1 hour. | * Sergei has added a new component PCal Ustrips (PCU) in the trigger, it's timing should be checked, call sergei and ask him to take over the DAQ to adjust the relative timing of PCU. This should approximetely take about 1 hour. | ||
− | * As soon Sergei has finished timing adjustment, ask for 35 nA beam, and take production data. | + | * As soon Sergei has finished timing adjustment, ask for 35 nA beam, and take production data with trigger_v5.trg |
+ | --> | ||
<!-- * If the machine is down and it is back start with low current first (2nA and 5 nA) making sure that the beam is stable in current and position before moving to 30 nA | <!-- * If the machine is down and it is back start with low current first (2nA and 5 nA) making sure that the beam is stable in current and position before moving to 30 nA | ||
--> | --> |
Revision as of 23:23, 21 February 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group A, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Rafayel Paremuzyan
- (757) 575-7540
- 9 575 7540 from Counting Room
- rafopar@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2H01 (X=1.0 mm, Y=-1.5 mm)
- Note 4: With beam to the Faraday Cup, typical rates on all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls.
Run Plan:(last update 2/20 - 1:15 AM)
|
General Instructions:
Every Shift:
Every Run:
|