* ''' Monday when hall is sweeped, ask MCC to energize the tagger magnet, and then follow instructions in section 1 "Beam to tagger-yoke dump" from this link https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf ''' | * ''' Monday when hall is sweeped, ask MCC to energize the tagger magnet, and then follow instructions in section 1 "Beam to tagger-yoke dump" from this link https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf ''' | ||
− | * ''' When good beam is establisged on tagger magnet Yoke, we should do two Moller runs, | + | * ''' When good beam is establisged on tagger magnet Yoke, we should do two Moller runs, 1st with half wave plate OUT, and 2nd with half wave plate "IN", please follow instructions in this link https://wiki.jlab.org/clas12-run/images/1/1d/Moller.pdf''' |
+ | |||
+ | * ''' When Moeller runs are finished, ask MCC to deGaus the tagger magnet, and follow instructions for sending the beam to Faraday Cup https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf Section 2'''. | ||
<!-- | <!-- |
Revision as of 20:54, 26 February 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group A, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Rafayel Paremuzyan
- (757) 575-7540
- 9 575 7540 from Counting Room
- rafopar@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2H01 (X=1.0 mm, Y=-1.5 mm)
- Note 4: With beam to the Faraday Cup, typical rates on all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls.
Run Plan:(last update 2/20 - 1:15 AM)
Updated Feb-24, 15:16
|
General Instructions:
Every Shift:
Every Run: Log screenshots of:
|
Webcams |
Manuals |
Epics on the web
|
Hall-B
Run lists |
Accelerator |
Bluejean meetings
|