Line 132: | Line 132: | ||
* When beam is available, notify run coordinator. Follow instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf] to get an acceptable beam profile. | * When beam is available, notify run coordinator. Follow instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf] to get an acceptable beam profile. | ||
<!--<del>Call PDL to ramp up solenoid and torus to 100%, with negative inbending.</del> --> | <!--<del>Call PDL to ramp up solenoid and torus to 100%, with negative inbending.</del> --> | ||
− | *Once the beam profile is satisfying (2C21:[https://logbooks.jlab.org/entry/3539650], 2C24:[https://logbooks.jlab.org/entry/3539651], perform Moller | + | *Once the beam profile is satisfying (2C21:[https://logbooks.jlab.org/entry/3539650], 2C24:[https://logbooks.jlab.org/entry/3539651], perform Moller runs (follow Moller procedure). |
− | + | * Two Moller measurements must be done, with half wave plate OUT and IN, leave half wave plate in IN position | |
− | * Two Moller measurements must be done, with half wave plate OUT and IN, | ||
* After the Moller runs, take the beam away, turn off Moller setup, degauss tagger magnet and send a 5nA beam to the Faraday Cup with empty target. <font color=red> Make sure Upstream, Midstream, Downstream, BOM and Solenoid FSDs are Unmasked with appropriate thresholds. </font> | * After the Moller runs, take the beam away, turn off Moller setup, degauss tagger magnet and send a 5nA beam to the Faraday Cup with empty target. <font color=red> Make sure Upstream, Midstream, Downstream, BOM and Solenoid FSDs are Unmasked with appropriate thresholds. </font> | ||
− | *Once the beam is going to the Faraday cup, | + | *Once the beam is going to the Faraday cup, perform 2H01 harp scan (see "Establish-physics quality beam" procedure). |
− | * | + | * After physics quality beam is established to Faraday cup, set correct FSD thresholds for 150nA run on empty target and then ask MCC to send 150 nA. |
*Except for SVT, turn on HVs for all detectors. Call SVT expert to turn ON SVT. | *Except for SVT, turn on HVs for all detectors. Call SVT expert to turn ON SVT. | ||
− | |||
− | |||
<!-- | <!-- | ||
* Till Monday morning continue taking production data with RGA Trigger: <b>trigger_v12_2.trg</b> @ 50nA | * Till Monday morning continue taking production data with RGA Trigger: <b>trigger_v12_2.trg</b> @ 50nA | ||
Line 147: | Line 144: | ||
− | * Take production data with trigger_v12_3.trg @ | + | * Take production data with trigger_v12_3.trg @ 150nA on empty target, 100M events per run till Tuesday morning when machine will go down for RF cavity work. |
* If the machine is down for few hours ask for low current first 5 nA make sure that the beam is stable both in position and current, check that the rates are OK on all the detectors and halo counters. Then ask for 50 nA and continue data for production. If there are issues with the beam call the RC. | * If the machine is down for few hours ask for low current first 5 nA make sure that the beam is stable both in position and current, check that the rates are OK on all the detectors and halo counters. Then ask for 50 nA and continue data for production. If there are issues with the beam call the RC. |