Difference between revisions of "Run Group M"

From clas12-run
Jump to navigation Jump to search
Line 147: Line 147:
  
 
== <font color=blue>''' Shift Worker Notes:'''</font>==
 
== <font color=blue>''' Shift Worker Notes:'''</font>==
<--
+
<!--
 
* From time to time, we might experience trigger bit issues (FT bits: 24, 25, 26, 27). Bit 26 might not trigger the alarm but when this issue happens it will count abnormally high. For the time being, shift leaders can try to do the sequence of End->Cancel->Reset, roc_reboot adcft1 (and adcft2, adcft3), make sure the ROCs are connected, then Download->Prestart->Go. If this does not work, repeat the sequence and add "Configure" in front of "Download". If the trig issue persists, continue to take production data without fixing it -- please make sure you log this infor in the RCDB "Comment" field.  
 
* From time to time, we might experience trigger bit issues (FT bits: 24, 25, 26, 27). Bit 26 might not trigger the alarm but when this issue happens it will count abnormally high. For the time being, shift leaders can try to do the sequence of End->Cancel->Reset, roc_reboot adcft1 (and adcft2, adcft3), make sure the ROCs are connected, then Download->Prestart->Go. If this does not work, repeat the sequence and add "Configure" in front of "Download". If the trig issue persists, continue to take production data without fixing it -- please make sure you log this infor in the RCDB "Comment" field.  
  
Line 179: Line 179:
  
 
==<font color=blue>''' General Instructions''':</font>==
 
==<font color=blue>''' General Instructions''':</font>==
<--
+
<!--
 
* For a given beam current, compute the FSD thresholds according to the [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf Establish Physics Quality Beam] document. Call MCC to update the values. Contact the beamline expert if there are questions about setting the FSD thresholds.
 
* For a given beam current, compute the FSD thresholds according to the [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf Establish Physics Quality Beam] document. Call MCC to update the values. Contact the beamline expert if there are questions about setting the FSD thresholds.
 
* The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cooldown.
 
* The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cooldown.

Revision as of 13:59, 5 October 2018

[edit]

If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[10 digit number]

Role Phone Number
Hall B Run Coordinator (757) 575-7540 (cell)
Hall B Physics Division Liaison (757) 876-1789 (cell)
MCC 7048
Crew Chief 7045
Crew Chief (757) 876-3367 (cell)
Program Deputy (757) 876-7997 (cell)
RadCon (757) 876-1743 (cell)
Gate House Guard 5822
Location Phone Number
Hall B Floor 5165
Hall B Space Frame 5170 and 5171
Hall B Forward Carriage 5371
Hall B Gas Shed 7115
Hall B Counting House 5244 (Shift Expert)
Hall B Counting House (757) 329-4846 (Shift Expert cell)
Hall B Counting House 5245 or 5126 (Shift Worker)
Hall A Counting House 5501
Hall C Counting House 6000
Hall D Counting House 5504
Hall B System Phone Number On-Call Person
Engineering (757) 748-5048 (cell)
(757) 897-9060 (cell)
Engineering On-Call (primary)
Denny Insley (secondary)
Slow Controls (757) 748-6922 (cell) Nathan Baltzell
Beamline (757) 303-3996 (cell) Eugene Pasyuk
DC (757) 218-4372 (cell)
(757) 748-5048 (cell)
Florian Hauenstein (primary)
Engineering On-Call (secondary)
SVT/MVT/MM (757) 541-7539 (cell)
(757) 753-7769 (cell)
Yuri Gotra (primary)
Rafo Paremuzyan (secondary)
ECAL (757) 810-1489 (cell) Cole Smith
FTOF/CTOF/CND (757) 344-7204 (cell) Daniel Carman
ALERT (757) 329-4844 (cell) Raphael Dupré
HTCC/LTCC (757) 344-7174 (cell) Youri Sharabian
FT (757) 344-1848 (cell) Raffaella De Vita
BAND (757) 310-7198 (cell) Florian Hauenstein
RICH (757) 344-3235 (cell)
(757) 748-6922 (cell)
Christopher Dilks (primary)
Nathan Baltzell (secondary)
DAQ (757) 232-6221 (cell) Sergey Boiarinov
HYDRA (317) 550-9226 (cell) Torri Jeske
Authorized Hall B Solenoid/Torus Operators
Hall B Denny Insley, Morgan Cook, Eugene Pasyuk
Magnet Group Probir Ghosha, Renuka Rajput-Ghoshal
Detector Support Group Brian Eng, Pablo Campero, Tyler Lemon
DC Power Onish Kumar, Sarin Philip
  • Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
  • To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
  • Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.

Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.


CLAS12 Run Group M, Summer 2020
Beam energies: 1.1, 2.2, 4.4, 6.6 GeV (1.1 GeV/pass)
Important: Document all your work in the logbook!

RC: Someone

PDL: XXXXX



Run Plan:

  • Any questions call system expert, RC or PDL.

Shift Worker Notes:

In case of other questions or uncertainties of what to do, call the RC

General Instructions:

Every Shift:

  • Follow run plan as outlined by RC
  • If any concern about beam stability, ask MCC if orbit locks are on (they should be).
  • Keep shift summary up to date in HBLOG. Record all that happens.
  • Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly
  • Document any beam condition change and send scaler GUIs to HBLOG
  • Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side.
  • Fill and submit the shift checklist in the logbook

Every Run:

Log screenshots of:

  • main scaler GUI display
  • Detector occupancy plots
  • Trigger rate gui
  • Beam strip charts
  • FTCalo FADC scalers


Clas12design.png