Difference between revisions of "KPP Run"
Jump to navigation
Jump to search
Line 98: | Line 98: | ||
# <del>Continue with data taking torus at -1900 A, target at 13.125, DC HV setting #11, thresholds 45 mV </del> | # <del>Continue with data taking torus at -1900 A, target at 13.125, DC HV setting #11, thresholds 45 mV </del> | ||
# <del> Switch target (call RC) and continue data taking till Sunday morning </del> | # <del> Switch target (call RC) and continue data taking till Sunday morning </del> | ||
− | # Change torus polarity. While torus current is changing, perform harp scans and FSD studies (see below) | + | # <del>Change torus polarity. While torus current is changing, perform harp scans and FSD studies (see below) |
# (Sunday morning while torus setting gets changed) Perform beam studies (call RC and beamline, <b> Turn off DC HV </b>): | # (Sunday morning while torus setting gets changed) Perform beam studies (call RC and beamline, <b> Turn off DC HV </b>): | ||
#*Do harp scans - 2C21, "tagger", and 2H01 | #*Do harp scans - 2C21, "tagger", and 2H01 | ||
− | #*Test FSD system, run Struck scaler with 300um dwel time, ask MCC to set FSD trip time integration times for FSD channels (1 old and 3 new) to 1 ms. Un-mask one FSD channel, run collimator with slmall steps to left or right untill it will intercept beam tails. It will raise rates on halo counters. | + | #*Test FSD system, run Struck scaler with 300um dwel time, ask MCC to set FSD trip time integration times for FSD channels (1 old and 3 new) to 1 ms. Un-mask one FSD channel, run collimator with slmall steps to left or right untill it will intercept beam tails. It will raise rates on halo counters. </del> |
# Take one 30 min run with torus at zero | # Take one 30 min run with torus at zero | ||
# Set torus +1900 A, continue data taking, trigger Sector-2 only, high threshold in EC-in (5000 fADC counts) | # Set torus +1900 A, continue data taking, trigger Sector-2 only, high threshold in EC-in (5000 fADC counts) |
Revision as of 12:13, 5 February 2017
[edit]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 KPP run, February 3 to March 3
Beam energy 6.4 GeV (3 pass)
Important: Document all your work in the logbook!
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan for February 4-5, 2017 :
Plan:
Important Notes:
|
General Instructions:Locking up the hall
Establishing Acceptable Beam Conditions:
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |
Epics on the web
|