Difference between revisions of "Run Group M"
Jump to navigation
Jump to search
Line 138: | Line 138: | ||
# Trigger without DC roads: 1 hour with the trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> | # Trigger without DC roads: 1 hour with the trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> | ||
− | + | * Production data taking with <b> rgm_6GeV_inb_v1_0.trg </b> 2 hour runs | |
− | |||
Line 193: | Line 192: | ||
==<font color=blue>''' General Instructions''':</font>== | ==<font color=blue>''' General Instructions''':</font>== | ||
− | + | * The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cool down. | |
− | + | * Do not run more than 30 minutes with >150 W beam to Faraday cup without the beam blocker. | |
− | * The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during | + | * Turn DC HV off only for beam tuning; if no beam is available or when the beam is stable, keep them on even if you are not taking data. |
− | * Do not run more than | ||
− | * Turn DC HV off only for beam tuning; if no beam is available or when beam is stable, keep them on even if you are not taking data. | ||
* In case of loss of communication with IOCBTARG, follow instructions at https://logbooks.jlab.org/entry/3502218 | * In case of loss of communication with IOCBTARG, follow instructions at https://logbooks.jlab.org/entry/3502218 | ||
− | |||
− | |||
* Check that no unnecessary beamline-related screens are open. This includes particularly the big beamline overview screen, but also and any motor/harp/collimator screens, and ioc health screens. | * Check that no unnecessary beamline-related screens are open. This includes particularly the big beamline overview screen, but also and any motor/harp/collimator screens, and ioc health screens. | ||
* Reference harp scans: [https://logbooks.jlab.org/entry/3571664 2C21], [https://logbooks.jlab.org/entry/3571676 2C24], [https://logbooks.jlab.org/entry/3571859 2H01] | * Reference harp scans: [https://logbooks.jlab.org/entry/3571664 2C21], [https://logbooks.jlab.org/entry/3571676 2C24], [https://logbooks.jlab.org/entry/3571859 2H01] | ||
+ | <!-- * With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem. | ||
+ | * All jscaler iocs (iocjscalerX) on the health screen (under DAQ tab) must be restarted after every DAQ prestart is completed. Follow this link for detailed instructions https://userweb.jlab.org/~baltzell/CLAS12/SC/jlabScalersOps.txt | ||
--> | --> | ||
'''Every Shift:''' | '''Every Shift:''' | ||
− | * Follow run plan as outlined by RC | + | * Follow the run plan as outlined by RC |
* If any concern about beam stability, ask MCC if orbit locks are on (they should be). | * If any concern about beam stability, ask MCC if orbit locks are on (they should be). | ||
* Keep shift summary up to date in HBLOG. Record all that happens. | * Keep shift summary up to date in HBLOG. Record all that happens. | ||
− | |||
* Document any beam condition change and send scaler GUIs to HBLOG | * Document any beam condition change and send scaler GUIs to HBLOG | ||
− | * [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to automatically fill the left side. | + | * [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to automatically fill the left side then correct as needed. |
* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] | * Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] | ||
Revision as of 08:59, 9 November 2021
[edit]
Shift ScheduleESAD, COO, RSAD Read before shift!!!Shift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[10 digit number]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group M, Fall 2021
Beam energies: 2.1, 4.0, 6.0 GeV (1.96 GeV/pass)
Important: Document all your work in the logbook!
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
- stepanya@jlab.org
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
- vpk@jlab.org
Run Plan: Nov 10 - 12 2021
Shift Worker Notes:In case of other questions or uncertainties of what to do, call the RC or PDL |
General Instructions:
Every Shift:
Every Run: Log screenshots of: (this is for the remote shifter, see dedicated tab above.)
|
Overview
Tasks
|
Shift Worker Backup Table
|
Hall-B
Run lists |
Accelerator |
Bluejean meetings
|