Difference between revisions of "Run Group M"

From clas12-run
Jump to navigation Jump to search
Line 131: Line 131:
 
* Restore physics quality beam for the production running at 3-pass, start from the tagger dump (see instructions [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab.pdf])  
 
* Restore physics quality beam for the production running at 3-pass, start from the tagger dump (see instructions [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab.pdf])  
 
* After physics quality beam is established to the Faraday cup dump, proceed with the following:
 
* After physics quality beam is established to the Faraday cup dump, proceed with the following:
** Establish produciton current for LH2 target (limit 80 nA), run DAQ with the produciton trigger Config. <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_v1_0.trg </b>)
+
** Fill the target with LH, see instructions at []
 +
** Establish production current for LH2 target (limit 80 nA), run DAQ with the production trigger Config. <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_v1_0.trg </b>)
 
** Trigger Validation Runs with the established conditions (Config. <b> PROD66_PIN </b>:
 
** Trigger Validation Runs with the established conditions (Config. <b> PROD66_PIN </b>:
 
# Random trigger @30 kHz 4 hours with the trigger <b> rgm_6GeV_inb_RNDM_30kHz_v1_0.trg </b>
 
# Random trigger @30 kHz 4 hours with the trigger <b> rgm_6GeV_inb_RNDM_30kHz_v1_0.trg </b>

Revision as of 20:37, 9 November 2021

[edit]


Clas12design.png