Difference between revisions of "Run Group M"

From clas12-run
Jump to navigation Jump to search
Line 137: Line 137:
 
** Fill the target with LH, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors
 
** Fill the target with LH, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors
 
** Ask for 10 nA beam, check if rates in the detectors are reasonable
 
** Ask for 10 nA beam, check if rates in the detectors are reasonable
** Establish production current for LH2 target (limit 80 nA), run DAQ with the production trigger Configuration <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_v1_0.trg </b> and increase beam current to 80 nA with steps of 5 nA. At every step record detector and DAQ rates (dump GUIs into logbook), run the monitoring and record DC R1 occupancy. After the run is done (went up to 80 nA), call Valery on th ePDL phone.
+
** Establish production current for LH2 target (limit 80 nA), run DAQ with the production trigger Configuration <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_v1_0.trg </b> and increase beam current to 80 nA with steps of 5 nA. At every step record detector and DAQ rates (dump GUIs into logbook), run the monitoring, and record DC R1 occupancy. After the run is done (went up to 80 nA), call Valery on the PDL phone.
  
 
Select the beam current when DC R1 occupancy are <5% and/or the DAQ LT is >95%(consult with RC).
 
Select the beam current when DC R1 occupancy are <5% and/or the DAQ LT is >95%(consult with RC).

Revision as of 16:55, 10 November 2021

[edit]


Clas12design.png