Difference between revisions of "Run Group M"

From clas12-run
Jump to navigation Jump to search
Line 140: Line 140:
  
 
Select the beam current when DC R1 occupancy are <5% and/or the DAQ LT is >95%(consult with RC).
 
Select the beam current when DC R1 occupancy are <5% and/or the DAQ LT is >95%(consult with RC).
** Start a new run with the selected beam current, use Configuration <b>PROD66_PIN</b> and the production trigger <b> rgm_6GeV_inb_v1_0.trg </b>, take 100 M events.
+
** Start a new run with the selected beam current, use Configuration <b>PROD66_PIN</b> and the production trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b>, take 100 M events.
 
** Trigger Validation Runs with the established conditions (Config. <b> PROD66_PIN </b>:
 
** Trigger Validation Runs with the established conditions (Config. <b> PROD66_PIN </b>:
 
# Random trigger @30 kHz 4 hours with the trigger <b> rgm_6GeV_inb_RNDM_30kHz_v1_0.trg </b>
 
# Random trigger @30 kHz 4 hours with the trigger <b> rgm_6GeV_inb_RNDM_30kHz_v1_0.trg </b>
 
<!-- # Trigger without DC roads: 1 hour with the trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> -->
 
<!-- # Trigger without DC roads: 1 hour with the trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> -->
  
* Production data taking with <b> rgm_6GeV_inb_v1_0.trg </b> 100 M events per run.
+
* Production data taking with <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b> 100 M events per run.
  
 
===Hall Access Items (Wednesday, November 11 at around 8:30 pm):===
 
===Hall Access Items (Wednesday, November 11 at around 8:30 pm):===

Revision as of 21:40, 10 November 2021

[edit]


Clas12design.png