* Establish physics quality beam for the production running at 3-pass<!--, start from the tagger dump --> (see instructions [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab.pdf])  
 
* Establish physics quality beam for the production running at 3-pass<!--, start from the tagger dump --> (see instructions [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab.pdf])  
 
* After physics quality beam is established to the Faraday cup dump, proceed with the following:
 
* After physics quality beam is established to the Faraday cup dump, proceed with the following:
** Fill the target with LH, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors
+
<!--** Fill the target with LH, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors -->
 
** Ask for 10 nA beam, check if rates in the detectors are reasonable
 
** Ask for 10 nA beam, check if rates in the detectors are reasonable
** Establish production current for LH2 target (limit 80 nA), run DAQ with the production trigger Configuration <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_v1_0.trg </b> and increase beam current to 80 nA with steps of 5 nA. At every step record detector and DAQ rates (dump GUIs into logbook), run the monitoring, and record DC R1 occupancy. After the run is done (went up to 80 nA), call Valery on the PDL phone.
+
<!-- ** Establish production current for LH2 target (limit 80 nA), run DAQ with the production trigger Configuration <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_v1_0.trg </b> and increase beam current to 80 nA with steps of 5 nA. At every step record detector and DAQ rates (dump GUIs into logbook), run the monitoring, and record DC R1 occupancy. After the run is done (went up to 80 nA), call Valery on the PDL phone.-->
  
Select the beam current when DC R1 occupancy are <5% and/or the DAQ LT is >95%(consult with RC).
+
Production beam current for KH2 target is 45 nA
** Start a new run with the selected beam current, use Configuration <b>PROD66_PIN</b> and the production trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b>, take 100 M events.
+
 
** Trigger Validation Runs with the established conditions (Config. <b> PROD66_PIN </b>:
+
* Take produciton data, use Configuration <b>PROD66_PIN</b> and the production trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b>, take 100 M events.
# Random trigger @30 kHz 4 hours, 2x2 hour runs, with the trigger <b> rgm_6GeV_inb_RNDM_30kHz_v1_0.trg </b>
+
* Trigger Validation Runs with the established conditions (Config. <b> PROD66_PIN </b>:
 +
** Random trigger @30 kHz 4 hours, 2x2 hour runs, with the trigger <b> rgm_6GeV_inb_RNDM_30kHz_v1_0.trg </b>
 
<!-- # Trigger without DC roads: 1 hour with the trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> -->
 
<!-- # Trigger without DC roads: 1 hour with the trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> -->
  
* Production data taking with <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b> 100 M events per run.
+
* Conitnue with production data taking with Config. <b> PROD66</b> and <b>rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b> 100 M events per run.
  
 
===Hall Access Items (Wednesday, November 11 at around 8:30 pm):===
 
===Hall Access Items (Wednesday, November 11 at around 8:30 pm):===