Line 134: Line 134:
 
A 3-pass, 5,986 GeV beam, LH2 target
 
A 3-pass, 5,986 GeV beam, LH2 target
 
<!--* Establish physics quality beam for the production running at 3-pass<!--, start from the tagger dump --> (see instructions [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab.pdf])  
 
<!--* Establish physics quality beam for the production running at 3-pass<!--, start from the tagger dump --> (see instructions [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab.pdf])  
* After physics quality beam is established to the Faraday cup dump, proceed with the following:
+
* After physics quality beam is established to the Faraday cup dump, proceed with the following:-->
 
<!--** Fill the target with LH, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors -->
 
<!--** Fill the target with LH, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors -->
** Ask for 10 nA beam, check if rates in the detectors are reasonable
+
<!--** Ask for 10 nA beam, check if rates in the detectors are reasonable
 
  ** Establish production current for LH2 target (limit 80 nA), run DAQ with the production trigger Configuration <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_v1_0.trg </b> and increase beam current to 80 nA with steps of 5 nA. At every step record detector and DAQ rates (dump GUIs into logbook), run the monitoring, and record DC R1 occupancy. After the run is done (went up to 80 nA), call Valery on the PDL phone.-->
 
  ** Establish production current for LH2 target (limit 80 nA), run DAQ with the production trigger Configuration <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_v1_0.trg </b> and increase beam current to 80 nA with steps of 5 nA. At every step record detector and DAQ rates (dump GUIs into logbook), run the monitoring, and record DC R1 occupancy. After the run is done (went up to 80 nA), call Valery on the PDL phone.-->
  