== <font color=blue>''' Run Plan: Nov 10 - 12 2021 '''</font>==  
 
== <font color=blue>''' Run Plan: Nov 10 - 12 2021 '''</font>==  
 
A 3-pass, 5,986 GeV beam, LH2 target
 
A 3-pass, 5,986 GeV beam, LH2 target
<!--* Establish physics quality beam for the production running at 3-pass, start from the tagger dump --> (see instructions [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab_rgm.pdf])  
+
<!--* Establish physics quality beam for the production running at 3-pass, start from the tagger dump (see instructions [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab_rgm.pdf])  
 
* After physics quality beam is established to the Faraday cup dump, proceed with the following:-->
 
* After physics quality beam is established to the Faraday cup dump, proceed with the following:-->
 
<!--** Fill the target with LH, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors -->
 
<!--** Fill the target with LH, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors -->
Line 141: Line 141:
 
Production beam current for LH2 target is 45 nA:
 
Production beam current for LH2 target is 45 nA:
  
* Trigger Validation Runs with the established conditions (Config. <b> PROD66_PIN </b>:
+
<!--* Trigger Validation Runs with the established conditions (Config. <b> PROD66_PIN </b>:
 
** Random trigger @30 kHz 4 hours, 2x2 hour runs, with the trigger <b> rgm_6GeV_inb_RNDM_30kHz_v1_0.trg </b>
 
** Random trigger @30 kHz 4 hours, 2x2 hour runs, with the trigger <b> rgm_6GeV_inb_RNDM_30kHz_v1_0.trg </b>
<!-- # Trigger without DC roads: 1 hour with the trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> -->
+
# Trigger without DC roads: 1 hour with the trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> -->
* after the random trigger run:
 
** call Sergey for EC TDC care reboot
 
** Yuri Gotra for the FMT no-beam test
 
  
* After FMT test contune production data taking with Config. <b> PROD66</b> and <b>rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b> 100 M events (max 2 hours) per run. <b> Note: if Valery will provide a new trigger file with Sector 6 no HTCC, use that file for the production runs </b>
+
* Production data taking with Config. <b> PROD66</b> and <b>rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b> 100 M events (max 2 hours) per run. <b> Note: if Valery will provide a new trigger file with Sector 6 no HTCC, use that file for the production runs </b>
  
===Hall Access Items (Friday, November 12):===
+
* Low luminosity run for SVT threshold studies - Yuri Gotra
 +
 
 +
 
 +
===Hall Access Items (Friday, November 12 at 10 am):===
 
* HTCC (Youri)
 
* HTCC (Youri)
 
* CTOF, cable repair (Daniel)
 
* CTOF, cable repair (Daniel)