Difference between revisions of "Run Group M"

From clas12-run
Jump to navigation Jump to search
Line 132: Line 132:
 
| valign=top width=50% |
 
| valign=top width=50% |
 
== <font color=blue>''' Run Plan: Nov 10 - 12 2021 '''</font>==  
 
== <font color=blue>''' Run Plan: Nov 10 - 12 2021 '''</font>==  
A 3-pass, 5,986 GeV beam, LH2 target
+
A 3-pass, 5,986 GeV beam, LD2 target
<!--* Establish physics quality beam for the production running at 3-pass, start from the tagger dump (see instructions [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab_rgm.pdf])  
+
* Establish physics quality beam for the production running at 3-pass, start from the tagger dump (see instructions [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab_rgm.pdf])  
* After physics quality beam is established to the Faraday cup dump, proceed with the following:-->
+
* After physics quality beam is established to the Faraday cup dump, proceed with the following:
<!--** Fill the target with LH, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors -->
+
** Fill the target with LH, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors
<!--** Ask for 10 nA beam, check if rates in the detectors are reasonable
+
** Ask for 10 nA beam, check if rates in the detectors are reasonable
  ** Establish production current for LH2 target (limit 80 nA), run DAQ with the production trigger Configuration <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_v1_0.trg </b> and increase beam current to 80 nA with steps of 5 nA. At every step record detector and DAQ rates (dump GUIs into logbook), run the monitoring, and record DC R1 occupancy. After the run is done (went up to 80 nA), call Valery on the PDL phone.-->
+
  ** Establish production current for LD2 target (limit 70 nA), run DAQ with the production trigger Configuration <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_v1_0.trg </b> and increase beam current to 70 nA with steps of 10 nA. At every step record detector and DAQ rates (dump GUIs into logbook), run the monitoring, and record DC R1 occupancy. After the run is done (went up to 70 nA), call Valery on the PDL phone.
  
Production beam current for LH2 target is 45 nA:
+
<!--Production beam current for LH2 target is 45 nA:
  
<!--* Trigger Validation Runs with the established conditions (Config. <b> PROD66_PIN </b>:
+
* Trigger Validation Runs with the established conditions (Config. <b> PROD66_PIN </b>:
 
** Random trigger @30 kHz 4 hours, 2x2 hour runs, with the trigger <b> rgm_6GeV_inb_RNDM_30kHz_v1_0.trg </b>
 
** Random trigger @30 kHz 4 hours, 2x2 hour runs, with the trigger <b> rgm_6GeV_inb_RNDM_30kHz_v1_0.trg </b>
 
  # Trigger without DC roads: 1 hour with the trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> -->
 
  # Trigger without DC roads: 1 hour with the trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> -->

Revision as of 15:58, 12 November 2021

[edit]


Clas12design.png