Difference between revisions of "Run Group M"
Jump to navigation
Jump to search
Line 137: | Line 137: | ||
** Fill the target with LH, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors | ** Fill the target with LH, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors | ||
** Ask for 10 nA beam, check if rates in the detectors are reasonable | ** Ask for 10 nA beam, check if rates in the detectors are reasonable | ||
− | + | ** Establish production current for LD2 target (limit 70 nA), run DAQ with the production trigger Configuration <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_v1_0.trg </b> and increase beam current to 70 nA with steps of 10 nA. At every step record detector and DAQ rates (dump GUIs into logbook), run the monitoring, and record DC R1 occupancy. After the run is done (went up to 70 nA), call Valery on the PDL phone. | |
<!--Production beam current for LH2 target is 45 nA: | <!--Production beam current for LH2 target is 45 nA: | ||
Line 145: | Line 145: | ||
# Trigger without DC roads: 1 hour with the trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> --> | # Trigger without DC roads: 1 hour with the trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> --> | ||
− | * Production data taking with Config. <b> | + | * Production data taking with Config. <b> PROD66_PIN</b> and <b>rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b> 100 M events (max 2 hours) per run. <b> Note: if Valery will provide a new trigger file with Sector 6 no HTCC, use that file for the production runs </b> |
− | |||
− | |||
− | |||