Difference between revisions of "Run Group M"
Jump to navigation
Jump to search
Line 137: | Line 137: | ||
** Fill the target with LH, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors | ** Fill the target with LH, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors | ||
** Ask for 10 nA beam, check if rates in the detectors are reasonable | ** Ask for 10 nA beam, check if rates in the detectors are reasonable | ||
− | ** Establish production current for LD2 target (limit 70 nA), run DAQ with the production trigger Configuration <b> PROD66 </b>, trigger <b> | + | ** Establish production current for LD2 target (limit 70 nA), run DAQ with the production trigger Configuration <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> and increase beam current to 70 nA with steps of 10 nA. At every step record detector and DAQ rates (dump GUIs into logbook), run the monitoring, and record DC R1 occupancy. After the run is done (went up to 70 nA), call Valery on the PDL phone. |
− | + | * After beam current for the production running on LD2 target is established, proceed with the trigger validation r - contact Valery on the PDL phone. Use Config. <b> PROD66_PIN </b> for these runs. | |
− | * | + | * Take one production run with Config. <b> PROD66_PIN</b> and the trigger <b>rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b>, 100 M events (max 2 hours)<b> |
− | |||
− | |||
− | |||
− | |||
+ | * Production data taking with Config. <b> PROD66</b> and the trigger <b>rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b>, 100 M events (max 2 hours) per run. <b> | ||