Difference between revisions of "Run Group M"
Jump to navigation
Jump to search
Line 139: | Line 139: | ||
** Establish production current for LD2 target (limit 70 nA), run DAQ with the production trigger Configuration <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> and increase beam current to 70 nA with steps of 10 nA. At every step record detector and DAQ rates (dump GUIs into logbook), run the monitoring, and record DC R1 occupancy. After the run is done (went up to 70 nA), call Valery on the PDL phone. | ** Establish production current for LD2 target (limit 70 nA), run DAQ with the production trigger Configuration <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> and increase beam current to 70 nA with steps of 10 nA. At every step record detector and DAQ rates (dump GUIs into logbook), run the monitoring, and record DC R1 occupancy. After the run is done (went up to 70 nA), call Valery on the PDL phone. | ||
− | * | + | * The beam current for the production running on LD2 target is <b>40 nA</b> |
+ | ** proceed with the trigger validation - contact Valery on the PDL phone. Use Config. <b> PROD66_PIN </b> for these runs. | ||
* Take one production run with Config. <b> PROD66_PIN</b> and the trigger <b>rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b>, 100 M events (max 2 hours)<b> | * Take one production run with Config. <b> PROD66_PIN</b> and the trigger <b>rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b>, 100 M events (max 2 hours)<b> |