Difference between revisions of "Run Group M"
Jump to navigation
Jump to search
Line 131: | Line 131: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == <font color=blue>''' Run Plan: Nov | + | == <font color=blue>''' Run Plan: Nov 12 - 14 2021 '''</font>== |
− | + | <b> Beam energy 5.986 GeV (3rd pass), LD2 target, the beam current for production data taking 40 nA</b> | |
− | * Establish physics quality beam for the production running at 3-pass, start from the tagger dump (see instructions [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab_rgm.pdf]) | + | <!--* Establish physics quality beam for the production running at 3-pass, start from the tagger dump (see instructions [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab_rgm.pdf]) |
* After physics quality beam is established to the Faraday cup dump, proceed with the following: | * After physics quality beam is established to the Faraday cup dump, proceed with the following: | ||
** Fill the target with LD, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors | ** Fill the target with LD, see instructions at [https://github.com/JeffersonLab/clas12-manuals/raw/master/target/Target_Shift_Worker_RGM_2021.pdf] and turn ON CLAS12 detectors | ||
Line 139: | Line 139: | ||
** Establish production current for LD2 target (limit 70 nA), run DAQ with the production trigger Configuration <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> and increase beam current to 70 nA with steps of 10 nA. At every step record detector and DAQ rates (dump GUIs into logbook), run the monitoring, and record DC R1 occupancy. After the run is done (went up to 70 nA), call Valery on the PDL phone. | ** Establish production current for LD2 target (limit 70 nA), run DAQ with the production trigger Configuration <b> PROD66 </b>, trigger <b> rgm_6GeV_inb_No_Dc_Roads_v1_0.trg </b> and increase beam current to 70 nA with steps of 10 nA. At every step record detector and DAQ rates (dump GUIs into logbook), run the monitoring, and record DC R1 occupancy. After the run is done (went up to 70 nA), call Valery on the PDL phone. | ||
− | |||
** proceed with the trigger validation - contact Valery on the PDL phone. Use Config. <b> PROD66_PIN </b> for these runs. | ** proceed with the trigger validation - contact Valery on the PDL phone. Use Config. <b> PROD66_PIN </b> for these runs. | ||
− | * Take one production run with Config. <b> PROD66_PIN</b> and the trigger <b>rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b>, 100 M events (max 2 hours) | + | * Take one production run with Config. <b> PROD66_PIN</b> and the trigger <b>rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b>, 100 M events (max 2 hours)--> |
+ | * Luminosity scan runs: Config. <b> PROD66_PIN</b> and the trigger <b>rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b> | ||
+ | ** beam current 10 nA - 2 hours | ||
+ | ** 30 nA - 2 hours | ||
+ | ** 50 nA - 1 hours | ||
+ | ** 60 nA - 1 hours | ||
* Production data taking with Config. <b> PROD66</b> and the trigger <b>rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b>, 100 M events (max 2 hours) per run. <b> | * Production data taking with Config. <b> PROD66</b> and the trigger <b>rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b>, 100 M events (max 2 hours) per run. <b> | ||
− | |||
===Hall Access Items (Friday, November 12 at 10 am):=== | ===Hall Access Items (Friday, November 12 at 10 am):=== |