Line 131: | Line 131: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == <font color=blue>''' Run Plan: Nov | + | == <font color=blue>''' Run Plan: Nov 15 - 17 2021 '''</font>== |
<b> Beam energy 5.986 GeV (3rd pass), LD2 target, the beam current for production data taking 50 nA</b> (as of 2 pm Sunday, Nov.14) | <b> Beam energy 5.986 GeV (3rd pass), LD2 target, the beam current for production data taking 50 nA</b> (as of 2 pm Sunday, Nov.14) | ||
<!--* Establish physics quality beam for the production running at 3-pass, start from the tagger dump (see instructions [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab_rgm.pdf]) | <!--* Establish physics quality beam for the production running at 3-pass, start from the tagger dump (see instructions [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab_rgm.pdf]) | ||
Line 148: | Line 148: | ||
** 30 nA - 2 hours | ** 30 nA - 2 hours | ||
** 50 nA - 1 hours | ** 50 nA - 1 hours | ||
− | ** 60 nA - 1 hours | + | ** 60 nA - 1 hours |
− | * <del>Production data taking with Config. <b> PROD66</b> and the trigger <b>rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b>, 100 M events (max 2 hours) per run. </del> | + | * <del>Production data taking with Config. <b> PROD66</b> and the trigger <b>rgm_6GeV_inb_No_Dc_Roads_v1_0.trg</b>, 100 M events (max 2 hours) per run. </del>--> |
− | * | + | * Production data taking with Config. <b> PROD66</b> and the trigger <b>rgm_6GeV_inb_v1_0.trg</b>, 100 M events (max 4 hours) per run. |
+ | * Low luminosity run 10 nA, the same configuration as for the production - 2 4-hour runs (8 hours total). | ||
===Hall Access Items (xxx):=== | ===Hall Access Items (xxx):=== | ||
* CVT/FVT - Yuri/Rafo | * CVT/FVT - Yuri/Rafo | ||
− | + | ||
== DAQ configuration == | == DAQ configuration == |