Difference between revisions of "Run Group M"

From clas12-run
Jump to navigation Jump to search
Line 110: Line 110:
 
*# the Fast Shut Down elements: Upstream, Midstream, Downstream, BOM, and Solenoid should always be in the state <font color=red>UNMASKED</font>
 
*# the Fast Shut Down elements: Upstream, Midstream, Downstream, BOM, and Solenoid should always be in the state <font color=red>UNMASKED</font>
 
*# No changes to the FSD threshold should be made without RC or beamline expert approval
 
*# No changes to the FSD threshold should be made without RC or beamline expert approval
<!--
+
 
*'''Note 7: Do not turn on the SVT or MM - only the SVT or MM expert can do that''
 
-->
 
 
*'''Note 6: Any request for a special run or change of configuration has to be approved by the RC & documented'''
 
*'''Note 6: Any request for a special run or change of configuration has to be approved by the RC & documented'''
  
Line 120: Line 118:
  
 
*'''Note 9: If crate ADCBAND was rebooted: Contact BAND expert and make a note in the HBBAND logbook and in HBLOG.'''
 
*'''Note 9: If crate ADCBAND was rebooted: Contact BAND expert and make a note in the HBBAND logbook and in HBLOG.'''
 +
 +
*'''Note 10: ECAL HV SEC2_WI_E36 is known to be problematic. Channel stays off for now.'''
 +
  
 
<!--
 
<!--

Revision as of 11:05, 18 November 2021

[edit]

If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[10 digit number]

Role Phone Number
Hall B Run Coordinator (757) 575-7540 (cell)
Hall B Physics Division Liaison (757) 876-1789 (cell)
MCC 7048
Crew Chief 7045
Crew Chief (757) 876-3367 (cell)
Program Deputy (757) 876-7997 (cell)
RadCon (757) 876-1743 (cell)
Gate House Guard 5822
Location Phone Number
Hall B Floor 5165
Hall B Space Frame 5170 and 5171
Hall B Forward Carriage 5371
Hall B Gas Shed 7115
Hall B Counting House 5244 (Shift Expert)
Hall B Counting House (757) 329-4846 (Shift Expert cell)
Hall B Counting House 5245 or 5126 (Shift Worker)
Hall A Counting House 5501
Hall C Counting House 6000
Hall D Counting House 5504
Hall B System Phone Number On-Call Person
Engineering (757) 748-5048 (cell)
(757) 897-9060 (cell)
Engineering On-Call (primary)
Denny Insley (secondary)
Slow Controls (757) 748-6922 (cell) Nathan Baltzell
Beamline (757) 303-3996 (cell) Eugene Pasyuk
DC (757) 218-4372 (cell)
(757) 748-5048 (cell)
Florian Hauenstein (primary)
Engineering On-Call (secondary)
SVT/MVT/MM (757) 541-7539 (cell)
(757) 753-7769 (cell)
Yuri Gotra (primary)
Rafo Paremuzyan (secondary)
ECAL (757) 810-1489 (cell) Cole Smith
FTOF/CTOF/CND (757) 344-7204 (cell) Daniel Carman
ALERT (757) 329-4844 (cell) Raphael Dupré
HTCC/LTCC (757) 344-7174 (cell) Youri Sharabian
FT (757) 344-1848 (cell) Raffaella De Vita
BAND (757) 310-7198 (cell) Florian Hauenstein
RICH (757) 344-3235 (cell)
(757) 748-6922 (cell)
Christopher Dilks (primary)
Nathan Baltzell (secondary)
DAQ (757) 232-6221 (cell) Sergey Boiarinov
HYDRA (317) 550-9226 (cell) Torri Jeske
Authorized Hall B Solenoid/Torus Operators
Hall B Denny Insley, Morgan Cook, Eugene Pasyuk
Magnet Group Probir Ghosha, Renuka Rajput-Ghoshal
Detector Support Group Brian Eng, Pablo Campero, Tyler Lemon
DC Power Onish Kumar, Sarin Philip
  • Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
  • To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
  • Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.

Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.


CLAS12 Run Group M, Fall 2021
Beam energies: 2.1, 4.0, 6.0 GeV (1.96 GeV/pass)
Important: Document all your work in the logbook!

RC: Florian Hauenstein

PDL: Valery Kubarovsky


  • Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.

The integrated rates on the upstream counters have to be in the range 0-15 Hz (rates up to 100 Hz are acceptable) and the rates on the midstream counters have to be in the range 10-20 Hz (acceptable up to 50 Hz) @50 nA. Counting rates in the range of hundreds of Hz may indicate a bad beam tune or bleed-through from other Halls.

  • Note 2: Nominal beam positions: 2C24A (X=-2.2 mm, Y=0.7 mm) , 2H01 (X=0.9 mm, Y=-0.3 mm)
  • Note 3: Do not turn OFF FTOF HVs, even during the beam tune with CW beam (turn off if tuned/pulsed beam in the upstream beamline)
  • Note 4: In case of a Torus and/or Solenoid Fast Dump do the following:
    1. Notify MCC to request beam OFF and to drop Hall B status to Power Permit
    2. Call Engineering on-call
    3. Make a separate log entry with copies to HBTORUS and HBSOLENOID logbooks. In the "Notify" field add Probir Goshal, Dave Kashy, and esr-users@jlab.org
    4. Notify Run Coordinator
    5. Turn off all detectors
  • Note 5: When the beam is being delivered to the Faraday Cup:
    1. the Fast Shut Down elements: Upstream, Midstream, Downstream, BOM, and Solenoid should always be in the state UNMASKED
    2. No changes to the FSD threshold should be made without RC or beamline expert approval
  • Note 6: Any request for a special run or change of configuration has to be approved by the RC & documented
  • Note 7: * Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then correct as needed.
  • Note 8: Reset CLAS12MON frequently to avoid histogram saturation.
  • Note 9: If crate ADCBAND was rebooted: Contact BAND expert and make a note in the HBBAND logbook and in HBLOG.
  • Note 10: ECAL HV SEC2_WI_E36 is known to be problematic. Channel stays off for now.



Run Plan: Nov 17 - 18 2021

Beam energy 5.986 GeV (3rd pass), LD2 target, the beam current for production data taking 50 nA (as of 2 pm Sunday, Nov.14)


  • Establish beam back in the hall on Faraday Cup and do a harp scan at 2H01
  • If harp scan is good, turn on detectors and continue Production data taking with Config. PROD66 and the trigger rgm_6GeV_inb_v1_0.trg, 100 M events (max 4 hours) per run.
  • Thursday Nov 18: Target change to He4

Hall Access Items (xxx):

  • CVT/FVT - Yuri/Rafo


DAQ configuration

PROD66 , production trigger rgm_6GeV_inb_v1_0.trg


At the end of each run, follow the STANDARD DAQ RESTART SEQUENCE

  • "end run", if the run ended correctly then: "prestart", "go"

  • if the run did not end correctly or if any ROCs had to be rebooted:
  • "cancel", "reset"
    • "configure", "download", "prestart", "go"
  • After each step, make sure it is completed in the Run Control message window. If a ROC has crashed, find which one it is, issue a roc_reboot command ON JUST THAT ROC and try again. Contact the DAQ expert if there are any questions.


Shift Worker Notes:

In case of other questions or uncertainties of what to do, call the RC or PDL Every Run: Log screenshots of (this is for the remote shifter)

  • Main beamline GUI overview
  • clas12mon Detector occupancy plots
  • Trigger rate GUI

References and Standards:

(last update 1/14/2020- 23:20)

Nominal Beam Positions

  • 2H01, X: +0.9 mm, Y: -0.3 mm
  • 2C24, X: -2.2 mm, Y: 0.7 mm

FSD Thresholds

  • Upstream: 2000 Hz
  • Midstream: 2000 Hz
  • Downstream: 500000 Hz
  • BOM: 10000

Reference Harp Scans for Beam on Faraday Cup: 2C24 (tagger harp) [1], 2H01 [2]

Reference Harp Scans for Beam on Tagger dump: 2C21 [3], 2C24 (tagger harp) [4]

Reference Monitoring Histograms (45 nA, production trigger) [5]

Counter rates

  • Upstream counters integrated rates: 0-15 Hz (acceptable up to 100 Hz are acceptable) @50 nA.
  • Midstream counters: 10-20 Hz (acceptable up to 50 Hz) @50 nA.
  • Counting rates of ~ hundreds of Hz may indicate bad beam tune or bleed-through from other Halls.

Beamline vacuum: should be not higher than 5e-5.


General Instructions:

  • The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cool down.
  • Do not run more than 30 minutes with >150 W beam to Faraday cup without the beam blocker.
  • Turn DC HV off only for beam tuning; if no beam is available or when the beam is stable, keep them on even if you are not taking data.
  • In case of loss of communication with IOCBTARG, follow instructions at https://logbooks.jlab.org/entry/3502218
  • Check that no unnecessary beamline-related screens are open. This includes particularly the big beamline overview screen, but also and any motor/harp/collimator screens, and IOC health screens.

Every Shift:

  • Follow the run plan as outlined by RC
  • If any concern about beam stability, ask MCC if orbit locks are on (they should be).
  • Keep shift summary up to date in HBLOG. Record all that happens.
  • Document any beam condition change and send scaler GUIs to HBLOG
  • Fill and submit the shift checklist in the logbook

Every Run:

Log screenshots of: (this is for the remote shifter, see dedicated tab above.)

  • Main beamline GUI overview
  • clas12mon Detector occupancy plots
  • Trigger rate GUI
  • FT-Cal FADC scalers

Webcams

Manuals

Hall Webcams

(the first time you open any camera in any browser, accept the security exception)

Epics on the web

Link to Live Monitoring/Progress Plots

RGM monitoring nov 16.png


Overview

Tasks


Shift Worker Backup Table

Worker Shift Backup
Date Day Swing Owl
Fri, Oct 15 John Doe Jane Doe Domenico D'Urso
Sat, Oct 16 Jane Doe Bob Cat Alber Einstein
Backup shifter contact info
Name Email Cell phone
Justin Estee esteejus@mit.edu 517 896 5905
Andrew Denniston awild@mit.edu + 987654321
Sara Ratliff ratliff_sara@gwmail.gwu.edu 774 266 6758
Erin Seroka erinseroka@gwmail.gwu.edu> + 987654321


Clas12design.png