Line 90: | Line 90: | ||
* Alert the Run Coordinator. | * Alert the Run Coordinator. | ||
* Start the beamline commissioning following the instructions described in [https://wiki.jlab.org/clas12-run/images/7/74/CLAS12_beamline_commissioning.pdf]. | * Start the beamline commissioning following the instructions described in [https://wiki.jlab.org/clas12-run/images/7/74/CLAS12_beamline_commissioning.pdf]. | ||
+ | * While performing the initial part of the beam tuning (beam to the tagger yoke), call E. Pasyuk (PDL phone) to have the magnets, torus and solenoid, energized at the proper settings to proceed to send beam to the Faraday Cup. | ||
* Record every relevant information in the logbook. | * Record every relevant information in the logbook. | ||
Revision as of 17:55, 7 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
RC: Raffaella DeVita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
Run Plan: beamline commissioning
Important Notes:
|
General Instructions:Locking up the hall
|
Every Shift:
|
Every Run:
|
---|