Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 88: | Line 88: | ||
* When preparing to receive beam, make sure the following conditions are established: all CLAS12 detectors are off and target is empty. For SVT, MVT, FTH and FTT, turn first HV off and then LV off. For any problem, consult with the expert-on-call. | * When preparing to receive beam, make sure the following conditions are established: all CLAS12 detectors are off and target is empty. For SVT, MVT, FTH and FTT, turn first HV off and then LV off. For any problem, consult with the expert-on-call. | ||
− | * Alert the Run Coordinator. | + | * Alert the Run Coordinator when MCC is preparing to send beam. |
* Start the beamline commissioning following the instructions described in [https://wiki.jlab.org/clas12-run/images/7/74/CLAS12_beamline_commissioning.pdf]. | * Start the beamline commissioning following the instructions described in [https://wiki.jlab.org/clas12-run/images/7/74/CLAS12_beamline_commissioning.pdf]. | ||
* While performing the initial part of the beam tuning (beam to the tagger yoke), call E. Pasyuk (PDL phone) to have the magnets, torus and solenoid, energized at the proper settings to proceed to send beam to the Faraday Cup. | * While performing the initial part of the beam tuning (beam to the tagger yoke), call E. Pasyuk (PDL phone) to have the magnets, torus and solenoid, energized at the proper settings to proceed to send beam to the Faraday Cup. |
Revision as of 17:56, 7 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
RC: Raffaella DeVita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
Run Plan: beamline commissioning
Important Notes:
|
General Instructions:Locking up the hall
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |
Epics on the web
|