Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 87: | Line 87: | ||
== <font color=blue>''' Run Plan: beamline commissioning'''</font>== | == <font color=blue>''' Run Plan: beamline commissioning'''</font>== | ||
− | * | + | * Whenever preparing to receive beam, make sure the following conditions are established: all CLAS12 detectors are off and target is empty. For SVT, MVT, FTH and FTT, turn first HV off and then LV off. For any problem, consult with the expert-on-call. |
− | * | + | * Continue the beamline commissioning following the instructions described in [https://wiki.jlab.org/clas12-run/images/7/74/CLAS12_beamline_commissioning.pdf]: |
− | + | ** establish beam to the faraday cup: beam current should be 1.5 nA, positions, quads settings and rates should be as in ; | |
− | * | + | ** make sure beam is stable and beam spot is clearly visible on the chromax viewer; |
− | * | + | ** with the support of the beamline expert, set FSD thresholds to trigger the beam shutdown in case rates become too high; |
+ | ** check the effect of the solenoid on the beam position by ramping from the present 50% to 100%: to do that ask E. Pasyuk (PDL phone) to do it or to give you directions; save the snapshot of the main gui in the logbook; | ||
+ | ** check the effect of the torus on the beam position by ramping from the present 0% to 100%: to do that ask E. Pasyuk (PDL phone) to do it or to give you directions; save the snapshot of the main gui in the logbook; | ||
+ | ** move the beam position at 2H01 by +/-2 mm in x and y in steps of 0.5 mm to ensure we are reasonably centered at the target; record rates from halo counters and BOM; stop the scan as soon as a significant increase of the rates is detected; while doing this, monitor the SVT leakage currents (detector is off) and make sure the currents do not increase significantly from the no-beam values; define the final beam positions based on the spot with the lowest rates; | ||
+ | ** turn on the forward carriage detectors: EC, PCAL, FTOF; check rates and record them in the logbook; | ||
+ | ** start the DAQ (consult with the DAQ expert) and start the online monitoring, CED and CLAS12MON; | ||
+ | ** prepare to fill the target (consult with Engineering on call). | ||
<!-- | <!-- |
Revision as of 23:43, 10 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
RC: Raffaella DeVita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
Run Plan: beamline commissioning
Important Notes:
|
General Instructions:Locking up the hall
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |
Epics on the web
|