Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 98: | Line 98: | ||
** start the DAQ (consult with the DAQ expert) and start the online monitoring, CED and CLAS12MON; | ** start the DAQ (consult with the DAQ expert) and start the online monitoring, CED and CLAS12MON; | ||
** prepare to fill the target (consult with Engineering on call). | ** prepare to fill the target (consult with Engineering on call). | ||
+ | ** whenever beam is off but Hall C has beam, checks rates and beam current monitor readings looking for possible bleedthrough. | ||
<!-- | <!-- |
Revision as of 23:55, 10 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
RC: Raffaella DeVita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
Run Plan: beamline commissioning
Important Notes:
|
General Instructions:Locking up the hall
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |
Epics on the web
|