Line 91: | Line 91: | ||
*# ask MCC to energize the tagger dipole magnet and set the current as needed for dumping the beam in the designated dump on the tagger yoke. MCC will ask you to change (set) the beam delivery mode. | *# ask MCC to energize the tagger dipole magnet and set the current as needed for dumping the beam in the designated dump on the tagger yoke. MCC will ask you to change (set) the beam delivery mode. | ||
*# position the \blank" collimator on the beam (this is a collimator block, 30 cm long Ni cylinder, without a hole) | *# position the \blank" collimator on the beam (this is a collimator block, 30 cm long Ni cylinder, without a hole) | ||
− | *# when the tagger magnet is at required setting ask MCC if they are ready to deliver beam to the tagger yoke dump (<=5 nA). It may take ~1 hour for MCC to setup and cleanly transport beam to the tagger yoke dump | + | *# when the tagger magnet is at required setting ask MCC if they are ready to deliver beam to the tagger yoke dump (<=5 nA). It may take ~1 hour for MCC to setup and cleanly transport beam to the tagger yoke dump. |
− | *# perform harp scans using the wire harp at 2C21 girder and 2c24 (tagger harp). Beam profile, peak position, width and signal/background ratio should be like in https://logbooks.jlab.org/entry/3502250 and https://logbooks.jlab.org/entry/3502252. Ask MCC | + | *# perform harp scans using the wire harp at 2C21 girder and 2c24 (tagger harp). Beam profile, peak position, width and signal/background ratio should be like in https://logbooks.jlab.org/entry/3502250 and https://logbooks.jlab.org/entry/3502252. Ask MCC to retune if needed (e.g. beam is too wide or asymmetric or has large tails),repeat the scan after every tune. Iterate to get acceptable beam profile. |
− | to retune if needed (e.g. beam is too wide or asymmetric or has large tails),repeat the scan after every tune. Iterate to get acceptable beam profile. | ||
* send the beam to Faraday Cup dump (otherwise known as electron dump). | * send the beam to Faraday Cup dump (otherwise known as electron dump). | ||
*# CLAS12 detectors should be OFF, the solenoid magnet current is at 50% its max, torus is at 100%. | *# CLAS12 detectors should be OFF, the solenoid magnet current is at 50% its max, torus is at 100%. | ||
*# ask MCC to degauss and turn the tagger dipole off; | *# ask MCC to degauss and turn the tagger dipole off; | ||
*# position 20 mm collimator on the beam and move \Chromox" screen of the downstream viewer in beam position (if it is not already) | *# position 20 mm collimator on the beam and move \Chromox" screen of the downstream viewer in beam position (if it is not already) | ||
− | + | *# ask for <= 1 nA, positions, quads settings and rates should be as in https://logbooks.jlab.org/entry/3502404; pay particular attention to halo counter rates: if very different from what shown in the link, call MCC and ask them to verify their settings; | |
− | * | + | *# make sure beam is stable, beam spot is clearly visible on the chromax viewer nd current does not exceed 1 nA.; |
− | * | + | *# repeat harp scans at 2c21, 2c24 (tagger harp) and 2h01: profile should be as in https://logbooks.jlab.org/entry/3502250, https://logbooks.jlab.org/entry/3502252 and https://logbooks.jlab.org/entry/3502313. Make sure you select the proper PMT for the analysis. The profile at 2c21a and 2c24 should be as in the scans performed with beam to the tagger. If necessary ask MCC to adjust the beam profile at 2H01 to match the previous scan. |
− | * | + | * once beam tuning is complete ask for 1.5 nA and ask MCC to unmask the FSD. |
− | |||
− | |||
− | |||
** turn on the forward carriage detectors: EC, PCAL, FTOF; check rates and record them in the logbook; | ** turn on the forward carriage detectors: EC, PCAL, FTOF; check rates and record them in the logbook; | ||
** start the DAQ (consult with the DAQ expert) and start the online monitoring, CED and CLAS12MON; | ** start the DAQ (consult with the DAQ expert) and start the online monitoring, CED and CLAS12MON; |
Revision as of 18:19, 11 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
RC: Raffaella DeVita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
Run Plan: beamline commissioning
Important Notes:
|
General Instructions:Locking up the hall
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |
Epics on the web
|