Difference between revisions of "Run Group M"
Line 140: | Line 140: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == <font color=blue>''' Run Plan: Dec | + | == <font color=blue>''' Run Plan: Dec 10 - Dec 14 2021 '''</font>== |
<b> PROD67_noVTPread </b> and the trigger <b>rgm_6GeV_inb_v1_0.trg</b>, Run duration should be no more than 100M events or 4 hours, whichever comes first. | <b> PROD67_noVTPread </b> and the trigger <b>rgm_6GeV_inb_v1_0.trg</b>, Run duration should be no more than 100M events or 4 hours, whichever comes first. | ||
<b>Summary</b> | <b>Summary</b> | ||
− | * Until | + | * Until Tuesday morning: running on Ca-40 at 150 nA/ |
− | * | + | * We will take 4 hours of low luminosity running (30 nA), to be scheduled. Call Yuri G before running. |
+ | * Tuesday, Dec. 14th, switch to 4He target. | ||
− | |||
− | |||
− | |||
== <font color=blue> DAQ configuration </font> == | == <font color=blue> DAQ configuration </font> == |
Revision as of 18:33, 10 December 2021
Shift ScheduleESAD, COO, RSAD Read before shift!!!Shift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[10 digit number]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group M, Fall 2021
Beam energies: 2.1, 4.0, 6.0 GeV (1.96 GeV/pass)
Important: Document all your work in the logbook!
RC: Larry Weinstein
- (757) 575-7540
- 9 575 7540 from Counting Room
- weinstei@jlab.org
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
- vpk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
The integrated rates on the upstream counters have to be in the range 0-15 Hz (rates up to 100 Hz are acceptable) and the rates on the midstream counters have to be in the range 10-20 Hz (acceptable up to 50 Hz) @50 nA. Counting rates in the range of hundreds of Hz may indicate a bad beam tune or bleed-through from other Halls.
- Note 2: Nominal beam positions: 2C24A (X=-2.0 mm, Y=0.6 mm) , 2H01 (X=-0.6 mm, Y=0.8 mm)
- Note 3: Do not turn OFF FTOF HVs, even during the beam tune with CW beam (turn off if tuned/pulsed beam in the upstream beamline)
- Note 4: In case of a Torus and/or Solenoid Fast Dump do the following:
- Notify MCC to request beam OFF and to drop Hall B status to Power Permit
- Call Engineering on-call
- Make a separate log entry with copies to HBTORUS and HBSOLENOID logbooks. In the "Notify" field add Probir Goshal, Dave Kashy, and esr-users@jlab.org
- Notify Run Coordinator
- Turn off all detectors
- Note 5: When the beam is being delivered to the Faraday Cup:
- the Fast Shut Down elements: Upstream, Midstream, Downstream, BOM, and Solenoid should always be in the state UNMASKED
- No changes to the FSD threshold should be made without RC or beamline expert approval
- Note 6: Any request for a special run or change of configuration has to be approved by the RC & documented
- Note 7: * Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then correct as needed.
- Note 8: Reset CLAS12MON frequently to avoid histogram saturation.
- Note 9: If crate ADCBAND was rebooted: Contact BAND expert and make a note in the HBBAND logbook and in HBLOG.
- Note 10: ECAL HV SEC2_WI_E36 is known to be problematic. Channel stays off for now.
- Note 11: LTCC is NOT used in this experiment. HV should be kept OFF.
- Note 12: If responding to RICH or Trigger alarms please post screens also to RICH or HBTRIGGER logbook, respectively.
- Note 13: Do a RICH recovery (press the RICH Recovery button on the GUI) once daily during the day shift between runs.
- Note 14: Cycle the FMT Gas once er shift. If done rapidly without pausing (Gas "stop"-"yes"-"start"-"yes"), the HV should not crash.
Run Plan: Dec 10 - Dec 14 2021PROD67_noVTPread and the trigger rgm_6GeV_inb_v1_0.trg, Run duration should be no more than 100M events or 4 hours, whichever comes first. Summary
DAQ configurationPROD67_noVTPread , production trigger rgm_6GeV_inb_v1_0.trg At the end of each run, follow the STANDARD DAQ RESTART SEQUENCE
Announcements
References and Standards:(last update 12/06/2021- 23:20) Nominal Beam Positions
FSD Thresholds
Reference Harp Scans for Beam on Faraday Cup: 2C24 (tagger harp) [1], 2H01 [2] Reference Harp Scans for Beam on Tagger dump: 2C21 [3], 2C24 (tagger harp) [4] Reference Monitoring Histograms (80 nA, production Ca-48) [5] Counter rates
Beamline vacuum: should be not higher than 5e-5.
|
General Instructions:
Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cool down.
Every Shift:
Log screenshots of: (this is for the remote shifter, see dedicated Remote Shifts tab above.)
In case of other questions or uncertainties of what to do, call the RC or PDL |
Webcams
|
Manuals |
Hall Webcams |
Epics on the web
|
Live Monitoring Links
|
|
Overview
Tasks
|
Shift Worker Backup Table
|
Hall-B
Run lists |
AcceleratorReferences |
BlueJeans meetings
|