Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 85: | Line 85: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == <font color=blue>''' Run Plan: | + | == <font color=blue>''' Run Plan:'''</font>== |
* Whenever preparing to receive beam, make sure the following conditions are established: all CLAS12 detectors are off and target is empty. For SVT, MVT, FTH and FTT, turn first HV off and then LV off. For any problem, consult with the expert-on-call. | * Whenever preparing to receive beam, make sure the following conditions are established: all CLAS12 detectors are off and target is empty. For SVT, MVT, FTH and FTT, turn first HV off and then LV off. For any problem, consult with the expert-on-call. | ||
Line 131: | Line 131: | ||
--> | --> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Line 143: | Line 137: | ||
==<font color=blue><b>General Instructions:</b></font>== | ==<font color=blue><b>General Instructions:</b></font>== | ||
+ | # '''During beam tune and harp scans Hall-B halo FSD must be masked.''' | ||
+ | # '''The main lights in the Hall(dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cooldown." | ||
+ | # '''Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents.''' | ||
+ | # '''If DAQ crashed/broken: Follow instruction on Documentation tab. If cannot resolved in 20-30 min call DAQ on-call cell phone.''' | ||
+ | # '''With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem.''' | ||
<!-- | <!-- | ||
Line 149: | Line 148: | ||
# [https://clonwiki0.jlab.org/wiki/index.php/DAQ/Online_Quick_Reference Reboot DAQ completely]. | # [https://clonwiki0.jlab.org/wiki/index.php/DAQ/Online_Quick_Reference Reboot DAQ completely]. | ||
# If the procedure fails to restore DAQ, call Sergey (DAQ on call) without any further disturbing the DAQ status. | # If the procedure fails to restore DAQ, call Sergey (DAQ on call) without any further disturbing the DAQ status. | ||
− | + | ||
=== Locking up the hall === | === Locking up the hall === | ||
* Work with the hall work coordinator (Doug Tilles or his designee) to make sure hall is ready for sweep at around 3pm: | * Work with the hall work coordinator (Doug Tilles or his designee) to make sure hall is ready for sweep at around 3pm: | ||
Line 161: | Line 160: | ||
** Turn tagger magnet ON if beam tune on the tagger dump or tagger yoke dump will be needed (it will be needed if beam comes back after several hours of down) | ** Turn tagger magnet ON if beam tune on the tagger dump or tagger yoke dump will be needed (it will be needed if beam comes back after several hours of down) | ||
** Turn all beamline devices ON, turn all CLAS12 detectors OFF | ** Turn all beamline devices ON, turn all CLAS12 detectors OFF | ||
− | + | --> | |
<!-- ===Establishing Acceptable Beam Conditions:=== | <!-- ===Establishing Acceptable Beam Conditions:=== | ||
# <font color='red'>'''Make sure CLAS12 is OFF When Beam is Turned For the First Time After long Down.'''</font> | # <font color='red'>'''Make sure CLAS12 is OFF When Beam is Turned For the First Time After long Down.'''</font> |
Revision as of 18:56, 11 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
RC: Raffaella DeVita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
Run Plan:
|
General Instructions:
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |
Epics on the web
|