Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 105: | Line 105: | ||
* turn on the forward carriage detectors: EC, PCAL, FTOF; check rates and record them in the logbook; | * turn on the forward carriage detectors: EC, PCAL, FTOF; check rates and record them in the logbook; | ||
* if rates are consistent with previous, proceed to turning on LTCC, DC, HTCC; | * if rates are consistent with previous, proceed to turning on LTCC, DC, HTCC; | ||
− | * turn on CTOF and CND; if rates are acceptable, contact | + | * turn on CTOF and CND; |
+ | * turn on FT-Hodo (FTH on epics); | ||
+ | * leave MVT and FTT off | ||
+ | * if rates are acceptable, contact Y. Gotra to turn on SVT; while Yuri will monitor the SVT, increase the beam current to 5-10 nA: to be able to do that, FSD thresholds that were set for 1.5 nA will have to be scaled up according to the current (the new thresholds have to be communicated to MCC that will set them in the system). | ||
* once all detectors are on, contact C. Smith (ECAL expert) to start the DAQ and online monitoring (CED and CLAS12MON): purpose of tonight running is to take data with empty target and different trigger configurations; the beam current, compatibly with SVT operation, can be adjusted to have a reasonable trigger rate; | * once all detectors are on, contact C. Smith (ECAL expert) to start the DAQ and online monitoring (CED and CLAS12MON): purpose of tonight running is to take data with empty target and different trigger configurations; the beam current, compatibly with SVT operation, can be adjusted to have a reasonable trigger rate; | ||
* whenever beam is off but Hall A or C have beam, checks rates and beam current monitor readings looking for possible bleedthrough. | * whenever beam is off but Hall A or C have beam, checks rates and beam current monitor readings looking for possible bleedthrough. |
Revision as of 21:16, 11 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
RC: Raffaella DeVita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
Run Plan:
|
General Instructions:
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |
Epics on the web
|