Difference between revisions of "Run Group M"

From clas12-run
Jump to navigation Jump to search
Line 120: Line 120:
 
** "configure", "download", "prestart", "go"
 
** "configure", "download", "prestart", "go"
 
* After each step, make sure it is completed in the Run Control message window.</font></b> If a ROC has crashed, find which one it is, issue a roc_reboot command ON JUST THAT ROC and try again. Contact the DAQ expert if there are any questions.
 
* After each step, make sure it is completed in the Run Control message window.</font></b> If a ROC has crashed, find which one it is, issue a roc_reboot command ON JUST THAT ROC and try again. Contact the DAQ expert if there are any questions.
 
  
 
== <font color=blue> References and Standards </font>==
 
== <font color=blue> References and Standards </font>==

Revision as of 16:45, 27 January 2022

[edit]

If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[ten digit number]

Role Phone Number
Hall B Run Coordinator (757) 575-7540 (cell)
Hall B Physics Division Liaison (757) 876-1789 (cell)
MCC 7048
Crew Chief 7045
Crew Chief (757) 876-3367 (cell)
Program Deputy (757) 876-7997 (cell)
RadCon (757) 876-1743 (cell)
Gate House Guard 5822
Location Phone Number
Hall B Floor 5165
Hall B Space Frame 5170 and 5171
Hall B Forward Carriage 5371
Hall B Gas Shed 7115
Hall B Counting House 5244 (Shift Expert)
Hall B Counting House (757) 329-4846 (Shift Expert cell)
Hall B Counting House 5245 or 5126 (Shift Worker)
Hall A Counting House 5501
Hall C Counting House 6000
Hall D Counting House 5504
Hall B System Phone Number On-Call Person
Engineering (757) 748-5048 (cell)
(757) 897-9060 (cell)
Engineering On-Call (primary)
Denny Insley (secondary)
Slow Controls (757) 748-6922 (cell) Nathan Baltzell
Beamline (757) 303-3996 (cell) Eugene Pasyuk
DC (757) 218-4372 (cell)
(757) 748-5048 (cell)
Florian Hauenstein (primary)
Engineering On-Call (secondary)
SVT/MVT/MM (757) 541-7539 (cell)
(757) 753-7769 (cell)
Yuri Gotra (primary)
Rafo Paremuzyan (secondary)
ECAL (757) 810-1489 (cell) Cole Smith
FTOF/CTOF/CND (757) 344-7204 (cell) Daniel Carman
ALERT (757) 329-4844 (cell) Raphael Dupré
HTCC/LTCC (757) 344-7174 (cell) Youri Sharabian
FT (757) 344-1848 (cell) Raffaella De Vita
BAND (757) 310-7198 (cell) Florian Hauenstein
RICH (757) 344-3235 (cell)
(757) 748-6922 (cell)
Christopher Dilks (primary)
Nathan Baltzell (secondary)
DAQ (757) 232-6221 (cell) Sergey Boiarinov
HYDRA (317) 550-9226 (cell) Torri Jeske
Authorized Hall B Solenoid/Torus Operators
Hall B Denny Insley, Morgan Cook, Eugene Pasyuk
Magnet Group Probir Ghosha, Renuka Rajput-Ghoshal
Detector Support Group Brian Eng, Pablo Campero, Tyler Lemon
DC Power Onish Kumar, Sarin Philip
  • Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
  • To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
  • Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.

Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.


CLAS12 Run Group M, Fall 2021

Beam energies: 2.1, 4.0, 6.0 GeV (1.96 GeV/pass)


RC: Susan Schadmand (phone below) and Sebastian Kuhn (kuhn@jlab.org, 757-639-6640)

PDL: Valery Kubarovsky


Run Plan: Jan 26 - Jan 30 2022

Production runs use PROD67_noVTPread and the trigger rgm_6GeV_inb_v1_0.trg .
Run duration 100M events or 4 hours, whichever comes first.

  • Presently running on Ar
    • beam blocker calibration (during day)
    • run on Ar target (at least until Saturday)
    • Take at least one run each (4 hours) with 5 nA and 10 nA.
    • run production at 25nA, 1-2 runs with configuration PROD67_PIN_noVTPread
  • switch to C target (for about 2 shifts)
    • Check with Bob Miller if we can take data while target is being purged from Ar ->
    • take C data while purging ? Or "empty" target run?
  • Sunday afternoon switch to LH2
    • 1 shift LH2
    • beam blocker calibration
    • During Monday owl: 4 hours empty target
  • Monday pass change (6GeV beam)
    • OUTLOOK: Run on Ar, Sn and C with 6 GeV beam

DAQ configuration

PROD67_noVTPread , production trigger rgm_6GeV_inb_v1_0.trg .

At the end of each run, follow the STANDARD DAQ RESTART SEQUENCE

  • "end run", if the run ended correctly then: "prestart", "go"

  • if the run did not end correctly or if any ROCs had to be rebooted:
  • "cancel", "reset"
    • "configure", "download", "prestart", "go"
  • After each step, make sure it is completed in the Run Control message window. If a ROC has crashed, find which one it is, issue a roc_reboot command ON JUST THAT ROC and try again. Contact the DAQ expert if there are any questions.

References and Standards

(last update 01/18/2022- 23:30)

Nominal Beam Positions

  • 2H01, X: -0.6 mm, Y: 0.8 mm
  • 2C24, X: -2.0 mm, Y: +0.6 mm

FSD Thresholds

  • Upstream: 2000 Hz
  • Midstream: 2000 Hz
  • Downstream: 500000 Hz
  • BOM: 10000
  • 5 ms dwell time

Reference Harp Scans for Beam on Faraday Cup: 2H01 [1]

Reference Harp Scans for Beam on Tagger dump: 2C21 [2], tagger harp [3]

Reference Monitoring Histograms (6 nA, production C) [4] Old reference Monitoring Histograms (50 nA, production LD2) [5]

Counter rates

  • Upstream counters integrated rates: 0-15 Hz (acceptable up to 100 Hz are acceptable) @50 nA.
  • Midstream counters: 10-20 Hz (acceptable up to 50 Hz) @50 nA.
  • Counting rates of ~ hundreds of Hz may indicate bad beam tune or bleed-through from other Halls.

Beamline vacuum: should be not higher than 5e-5.

Notes

  • Note 1: The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during access, they should be switched off when leaving the Hall. Refer to these photos:
    • ON: [6]
    • OFF: [7]
    • Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cool down.
  • Note 2: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
    • The integrated rates on the upstream counters have to be in the range 0-15 Hz (rates up to 100 Hz are acceptable) and the rates on the midstream counters have to be in the range 10-20 Hz (acceptable up to 50 Hz) @50 nA. Counting rates in the range of hundreds of Hz may indicate a bad beam tune or bleed-through from other Halls.
  • Note 3: When the beam is being delivered to the Faraday Cup:
    1. the Fast Shut Down elements: Upstream, Midstream, Downstream, BOM, and Solenoid should always be in the state UNMASKED
    2. No changes to the FSD threshold should be made without RC or beamline expert approval
  • Note 4: Do not run more than 30 minutes with >150 W beam to Faraday cup without the beam blocker.
  • Note 5: Any request for a special run or change of configuration has to be approved by the RC & documented
  • Note 6: Do not turn OFF FTOF HVs, even during the beam tune with CW beam (turn off if tuned/pulsed beam in the upstream beamline)
  • Note 7: Turn DC HV off only for beam tuning; if no beam is available or when the beam is stable, keep them on even if you are not taking data.
  • Note 10: Reset CLAS12MON frequently to avoid histogram saturation.
  • Note 11: In case of a Torus and/or Solenoid Fast Dump do the following:
    1. Notify MCC to request beam OFF and to drop Hall B status to Power Permit
    2. Call Engineering on-call
    3. Make a separate log entry with copies to HBTORUS and HBSOLENOID logbooks. In the "Notify" field add Probir Goshal, Dave Kashy, and esr-users@jlab.org
    4. Notify Run Coordinator
    5. Turn off all detectors
  • Note 12: LTCC is NOT used in this experiment. HV should be kept OFF.
  • Note 13: If responding to RICH or Trigger alarms please post screens also to RICH or HBTRIGGER logbook, respectively.



Known Issues

  • ECAL HV SEC2_WI_E36 is known to be problematic. Channel stays off for now.
  • If any weird stripes appear in the DC occupancy plots, call Sergey. This is a known problem.
  • In case of loss of communication with IOCBTARG, follow instructions at https://logbooks.jlab.org/entry/3502218
    • Check that no unnecessary beamline-related screens are open. This includes particularly the big beamline overview screen, but also and any motor/harp/collimator screens, and IOC health screens.
  • The error messages " ERR: Event ..." for crates tdcband1, tdcecal1 and tdcecal6 are NOT a problem


  • Follow the [Short Term Schedule] as outlined by RC
    • includes Run Plan, DAQ configuration, and References and Standards
  • If any concern about beam stability, ask MCC if orbit locks are on (they should be).
  • Keep shift summary up to date in HBLOG. Record all that happens.
  • Document any beam condition change and send scaler GUIs to HBLOG
  • Cycle the FMT gas once per shift, in-between runs. If it is not reset, the interlock may drop and disable the HV.
    • Turning off and on the gas flow without pausing to avoid HV trips. If the HV tripped, make sure that once gas flow is restarted and the flow differential is down to reasonable values, to turn the FMT HV back on and let it ramp all the way up. Remember that this experiment is only using 3 FMT layers, not 6.
  • Do a RICH recovery (press the RICH Recovery button on the GUI) once daily during the day shift between runs.
  • Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then correct as needed.

In case of other questions or uncertainties of what to do, call the RC or PDL

(remote) shift worker: see dedicated Remote Shifts tab above.




Tasks

Every Run:

  • WITH BEAM, log screen shots of
    • Beamline Overview
    • CLAS12 Trigger rates and DAQ status


Every Shift:

  • log screen shots of RICH temperature and scaler maps
  • Alarms
    • If responding to RICH or Trigger alarms please post screens also to RICH or HBTRIGGER logbook, respectively



Backup shifter contact info
Name Email Cell phone
Justin Estee esteejus@mit.edu
Andrew Denniston awild@mit.edu
Sara Ratliff ratliff_sara@gwmail.gwu.edu
Erin Seroka erinseroka@gwmail.gwu.edu

Webcams

Manuals

Hall Webcams

Epics on the web


Live Monitoring Links



RGM monitoring dec 21 charge.png




Clas12design.png