Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 92: | Line 92: | ||
* Tune the beam to the Faraday Cup and complete harp scans at 2C21, 2C24, and 2H01. These scans should match the standard plots (see logbook links under "Beam Tuning") | * Tune the beam to the Faraday Cup and complete harp scans at 2C21, 2C24, and 2H01. These scans should match the standard plots (see logbook links under "Beam Tuning") | ||
− | * Perform a beam scan across the target using the horizontal correctors at 2H01 by several millimeters in each direction to find the center of the target. Move in 0.5 mm steps and record the 4 downstream halo counter rates at each position. Center the beam at the horizontal position that minimizes and balances the rates. Repeat the scan in the vertical direction by several millimeters in each direction to find the center of the target. The scans should proceed in each direction until the walls of the target are sensed. Record all rates in a table in the logbook | + | * Perform a beam scan across the target using the horizontal correctors at 2H01 by several millimeters in each direction to find the center of the target. Move in 0.5 mm steps and record the 4 downstream halo counter rates at each position. Center the beam at the horizontal position that minimizes and balances the rates. Repeat the scan in the vertical direction by several millimeters in each direction to find the center of the target. The scans should proceed in each direction until the walls of the target are sensed. Record all rates in a table in the logbook. |
* Position the beam at the center of the target and turn on the FT-Cal HV and LV (contact the expert for instructions) and check the beam centering using the scaler GUI. Record the rates in the logbook. Due to the lack of cooling in FT-Cal, do not leave the power on for more than 1 hr | * Position the beam at the center of the target and turn on the FT-Cal HV and LV (contact the expert for instructions) and check the beam centering using the scaler GUI. Record the rates in the logbook. Due to the lack of cooling in FT-Cal, do not leave the power on for more than 1 hr | ||
* Once beam tuning is complete move the beam blocker in (beam should be off for this), ask for 1.5 nA and ask MCC to unmask the FSD. | * Once beam tuning is complete move the beam blocker in (beam should be off for this), ask for 1.5 nA and ask MCC to unmask the FSD. |
Revision as of 23:18, 13 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Torus : +3770 A (100% field); Solenoid : +1208 A (50% field)
Important: Document all your work in the logbook!
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
Run Plan:
|
General Instructions:
Beam Tuning:
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |
Epics on the web
|