Difference between revisions of "Run Group C"

From clas12-run
Jump to navigation Jump to search
Line 185: Line 185:
 
** includes Run Plan, DAQ configuration, and References and Standards
 
** includes Run Plan, DAQ configuration, and References and Standards
 
* Keep '''shift summary''' up to date in HBLOG. Record all that happens.
 
* Keep '''shift summary''' up to date in HBLOG. Record all that happens.
 
* '''Cycle the FMT gas once per shift''', in-between runs. Pease log in shift summary. 
 
** If it is not reset, the interlock may drop and disable the HV.
 
** Turning off and on the  gas flow without pausing to avoid HV trips.
 
** If the HV tripped, make sure that once gas flow is restarted and the flow differential is down to reasonable values, to turn the FMT HV back on and let it ramp all the way up.
 
** Remember that this experiment is only using 3 FMT layers, not 6.
 
  
 
* Do a '''RICH recovery''' (press the RICH Recovery button on the GUI) once daily during day shift, between runs. Please log in shift summary.
 
* Do a '''RICH recovery''' (press the RICH Recovery button on the GUI) once daily during day shift, between runs. Please log in shift summary.

Revision as of 14:51, 19 April 2022

[edit]
Role Phone Number
Hall B Run Coordinator (757) 575-7540 (cell)
Hall B Physics Division Liaison (757) 876-1789 (cell)
MCC 7048
Crew Chief 7045
Crew Chief (757) 876-3367 (cell)
Program Deputy (757) 876-7997 (cell)
RadCon (757) 876-1743 (cell)
Gate House Guard 5822
Location Phone Number
Hall B Floor 5165
Hall B Space Frame 5170 and 5171
Hall B Forward Carriage 5371
Hall B Gas Shed 7115
Hall B Counting House 5244 (Shift Expert)
Hall B Counting House (757) 329-4846 (Shift Expert cell)
Hall B Counting House 5245 or 5126 (Shift Worker)
Hall A Counting House 5501
Hall C Counting House 6000
Hall D Counting House 5504
Hall B System Phone Number On-Call Person
Engineering (757) 748-5048 (cell)
(757) 897-9060 (cell)
Engineering On-Call (primary)
Denny Insley (secondary)
Slow Controls (757) 748-6922 (cell) Nathan Baltzell
Beamline (757) 303-3996 (cell) Eugene Pasyuk
DC (757) 218-4372 (cell)
(757) 748-5048 (cell)
Florian Hauenstein (primary)
Engineering On-Call (secondary)
SVT/MVT/MM (757) 541-7539 (cell)
(757) 753-7769 (cell)
Yuri Gotra (primary)
Rafo Paremuzyan (secondary)
ECAL (757) 810-1489 (cell) Cole Smith
FTOF/CTOF/CND (757) 344-7204 (cell) Daniel Carman
ALERT (757) 329-4844 (cell) Raphael Dupré
HTCC/LTCC (757) 344-7174 (cell) Youri Sharabian
FT (757) 344-1848 (cell) Raffaella De Vita
BAND (757) 310-7198 (cell) Florian Hauenstein
RICH (757) 344-3235 (cell)
(757) 748-6922 (cell)
Christopher Dilks (primary)
Nathan Baltzell (secondary)
DAQ (757) 232-6221 (cell) Sergey Boiarinov
HYDRA (317) 550-9226 (cell) Torri Jeske
Authorized Hall B Solenoid/Torus Operators
Hall B Denny Insley, Morgan Cook, Eugene Pasyuk
Magnet Group Probir Ghosha, Renuka Rajput-Ghoshal
Detector Support Group Brian Eng, Pablo Campero, Tyler Lemon
DC Power Onish Kumar, Sarin Philip
  • Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
  • To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
  • Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.

Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.


CLAS12 Run Group C, Summer 2022

Daily RC Meetings at X:00: https://zozoom.asdf

RC: Jane Doe

  • (757) 575-7540

PDL: Eugene Pasyuk

  • (757) 876-1789

Run Plan: June 2022

Production runs use PROD67_noVTPread and the trigger rgm_6GeV_inb_v1_0.trg

Run duration 100M events or 4 hours, whichever comes first.

  • run 6GeV 80 nA on Ca48 target (240 mg/cm2), beam blocker IN, until SAD
  • low luminosity runs:(ca 3pm - 9pm on Feb 7)
    • 2 hrs 5nA
    • 2 hrs 10 nA
    • 2 hrs 40 nA
  • the run on Ca48 until 6am, Feb 8
  • 6am Feb 8: Investigate BLA tune beam trips with tune beam to Hall B, https://devweb.acc.jlab.org/CSUEApps/atlis/task/24015
  • RC will be there at 6 am and follow Eugene's instruction
    • put the blank collimator in
    • turn HV off for all tracking detectors, just in case if the tagger magnet trips during the test
    • MCC may mask upstream halo FSD if necessary but keep all other FSD unmasked

DAQ configuration

  • Configuration PROD67_noVTPread, trigger file rgm_6GeV_inb_v1_0.trg
  • NOTE: UNLESS a RICH problem crashes the DAQ, do NOT interrupt an otherwise smooth run to do a RICH recovery - instead do this in between runs.
  • NOTE: BOTH the shift expert AND the shift worker MUST check monitoring histograms at least once every 30-60 minutes to make sure there are no major detector problems.
  • At the end of each run, follow the STANDARD DAQ RESTART SEQUENCE:
    • "end run", if the run ended correctly then: "prestart", "go"
    • if the run did not end correctly or if any ROCs had to be rebooted:
      • "cancel", "reset"
      • "configure", "download", "prestart", "go"
  • After each step, make sure it is completed in the Run Control message window. If a ROC has crashed, find which one it is, issue a roc_reboot command ON JUST THAT ROC and try again. Contact the DAQ expert if there are any questions.

References and Standards

Nominal Beam Positions

  • 2H01, X: -0.6 mm, Y: 0.8 mm
  • 2C24, X: -2.0 mm, Y: +0.6 mm

FSD Thresholds

  • Upstream: 2000 Hz
  • Midstream: 2000 Hz
  • Downstream: 500000 Hz
  • BOM: 10000
  • 5 ms dwell time

Reference Harp Scans for Beam on Faraday Cup 2H01 [1]

Reference Harp Scans for Beam on Tagger dump 2C21 [2], tagger harp [3]

Reference Monitoring Histograms

Counter rates

  • Upstream counters integrated rates: 0-15 Hz (acceptable up to 100 Hz are acceptable) @50 nA.
  • Midstream counters: 10-20 Hz (acceptable up to 50 Hz) @50 nA.
  • Counting rates of ~ hundreds of Hz may indicate bad beam tune or bleed-through from other Halls.


NOTE: BOTH the shift expert AND the shift worker MUST check monitoring histograms at least once every 30 - 60 minutes to make sure there are no major detector problems.

  • Follow the [Short Term Schedule] as outlined by RC
    • includes Run Plan, DAQ configuration, and References and Standards
  • Keep shift summary up to date in HBLOG. Record all that happens.
  • Do a RICH recovery (press the RICH Recovery button on the GUI) once daily during day shift, between runs. Please log in shift summary.
    • Note the automated "RICH Recovery" sequence already confirms RICH4 is up and accepting ssh connections before claiming success. And it also prints out that you have to "Cancel->Reset->Configure->Download->Prestart" before starting the next run.
  • Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then correct as needed.
    • Accelerator beam time:
      • ABU: acceptable beam used (eg harp scans, calibrations, trigger settings, running)
      • BANU: beam acceptable but not used (eg radiator change or our problems)
      • BNA: beam not acceptable (eg tuning, drifting, not focused)
    • Experiment beam time
      • ER: experiment ready
      • PCC: planned configuration change (when beam is masked while radiators are moved, DAQ (roc rebooting, restarting runs)), if more than 5 minutes, put a short comment, eg harp scans or DAQ.
      • UED: unplanned experiment down (hardware failure)


In case of other questions or uncertainties of what to do, call the RC or PDL

(remote) shift worker: see dedicated Remote Shifts tab above.


Tasks

Every Run:

  • With beam present, log screen shots of:
    • Beamline Overview, in VNC or Web Browser
    • CLAS12 Trigger rates and DAQ status

Every Shift:

  • Fill the shift checklist
  • Log screen shots of RICH temperature and scaler maps. Log in HBLOG and RICH logbook.

Regularly:

  • reset & check spectra frequently (every 30 - 60 minutes)
    • Some plots in mon12 have a choice of histogram sets per sector, select buttons at the bottom of the plot. Only the currently selected set ends up in the logbook entry.
    • that means you have to look at all sectors for these histograms
Backup shifter contact info
Name Email Cell phone
Bob Cat bob@cat.org
John Doe johndoe@gmail.com

Webcams

Manuals

Epics on the web

Live Monitoring Links

RGM monitoring dec 21 charge.png



Clas12design.png