Line 108: | Line 108: | ||
* Turn on CTOF,CND, FT-Hodo; | * Turn on CTOF,CND, FT-Hodo; | ||
* If rates are acceptable, contact Y. Gotra to turn on SVT and M. Defurne to turn on MVT and FTT; while Yuri will monitor the SVT, increase the beam current to 5 nA: to be able to do that, FSD thresholds that were set for 1.5 nA will have to be scaled up according to the current (the new thresholds have to be communicated to MCC that will set them in the system). | * If rates are acceptable, contact Y. Gotra to turn on SVT and M. Defurne to turn on MVT and FTT; while Yuri will monitor the SVT, increase the beam current to 5 nA: to be able to do that, FSD thresholds that were set for 1.5 nA will have to be scaled up according to the current (the new thresholds have to be communicated to MCC that will set them in the system). | ||
− | * Once all detectors are on, record rates in all detectors, and currents in the DC, SVT, and MM, at solenoid field settings of 50%, 60%, 70%, 80%, 90%, and 100%. Make | + | * Once all detectors are on, record rates in all detectors, and currents in the DC, SVT, and MM, at solenoid field settings of 50%, 60%, 70%, 80%, 90%, and 100%. Make sure that the logbook information is complete and readable! |
− | sure that the logbook information is complete and readable! | ||
* At 100% solenoid field, record rates in all detectors, and currents in the DC, SVT, and MM, at beam currents of 5 nA, 15 nA, 25 nA, ... The beam intensity and duration will be established by the beamline expert and the SVT and MM experts. Make sure that the logbook information is complete and readable! | * At 100% solenoid field, record rates in all detectors, and currents in the DC, SVT, and MM, at beam currents of 5 nA, 15 nA, 25 nA, ... The beam intensity and duration will be established by the beamline expert and the SVT and MM experts. Make sure that the logbook information is complete and readable! | ||
* At 100% solenoid field take 30 of data at the highest current authorized by the SVT/MM folks (ensuring that the DC and other detector currents/rates are acceptable). Select the trigger file based on high threshold ECAL clusters (to select electrons). Contact the DAQ expert to set this up. | * At 100% solenoid field take 30 of data at the highest current authorized by the SVT/MM folks (ensuring that the DC and other detector currents/rates are acceptable). Select the trigger file based on high threshold ECAL clusters (to select electrons). Contact the DAQ expert to set this up. |
Revision as of 13:59, 14 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Torus : +3770 A (100% field); Solenoid : +1208 A (50% field)
Important: Document all your work in the logbook!
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
Run Plan:
beam intensity and duration will be established by the beamline expert, the SVT and MM experts, the DC experts, and the Forward Carriage experts.
|
General Instructions:
Beam Tuning:
|
Every Shift:
|
Every Run:
|
---|