Line 124: | Line 124: | ||
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)</b> | When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)</b> | ||
− | == Establish beam to the tagger yoke dump == | + | <-- == Establish beam to the tagger yoke dump == |
# Work with MCC to establish beam on the tagger yoke dump - <b>This is the first time we are running to this new dump, record everything, rates in some of halo counters can be away off the chart. Consult with RC if you see something very unusual. </b> | # Work with MCC to establish beam on the tagger yoke dump - <b>This is the first time we are running to this new dump, record everything, rates in some of halo counters can be away off the chart. Consult with RC if you see something very unusual. </b> | ||
# See [[Media:CLAS12_beamline_commissioning.pdf|Beamline Commissioning Plans]] for details, execute 2(a) to 2(g). <b> Note, MCC may use up to 4 uA tune mode beam for short time periods for steering purposes </b>. | # See [[Media:CLAS12_beamline_commissioning.pdf|Beamline Commissioning Plans]] for details, execute 2(a) to 2(g). <b> Note, MCC may use up to 4 uA tune mode beam for short time periods for steering purposes </b>. | ||
Line 130: | Line 130: | ||
# Log Main scaler GUI every time conditions change | # Log Main scaler GUI every time conditions change | ||
# Follow the beam position and current strip charts for 2C21 and 2C24 nA BPMs, make log entry of strip chartes | # Follow the beam position and current strip charts for 2C21 and 2C24 nA BPMs, make log entry of strip chartes | ||
+ | |||
== Bring beam to FC: == | == Bring beam to FC: == | ||
− | # Establish beam to the Faraday cup following the Beamline Commissioning Plans | + | # Establish beam to the Faraday cup following the Beamline Commissioning Plans; |
− | # Log every harp scan | + | # Log every harp scan; |
− | # Log Main scaler GUI every time conditions change | + | # Log Main scaler GUI every time conditions change; |
− | # Follow the beam position and current strip charts for 2C21 and 2C24 nA BPMs, make log entry of strip charts | + | # Follow the beam position and current strip charts for 2C21 and 2C24 nA BPMs, make log entry of strip charts; |
− | # Setup FSD | + | # Setup FSD; |
− | |||
− | |||
--> | --> | ||
Revision as of 14:06, 14 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Torus : +3770 A (100% field); Solenoid : +1208 A (50% field)
Important: Document all your work in the logbook!
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
Run Plan:All studies for the next few shifts will use 100% torus field (negatives bending in); the strength of the solenoid field and the status of the hydrogen target are listed below.
While no beam, cosmic calibration run is in progress with all CLAS12 detectors ON. When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT) <-- == Establish beam to the tagger yoke dump ==
Bring beam to FC:
-->
|
General Instructions:
Beam Tuning:
|
Every Shift:
|
Every Run:
|
---|