* Turn on the Forward Carriage detectors: ECAL, FTOF; check rates and record them in the logbook; | * Turn on the Forward Carriage detectors: ECAL, FTOF; check rates and record them in the logbook; | ||
* If rates are consistent with previous good beam tune, proceed to turning on LTCC, DC, HTCC, CTOF,CND, FT-Hodo; | * If rates are consistent with previous good beam tune, proceed to turning on LTCC, DC, HTCC, CTOF,CND, FT-Hodo; | ||
− | * If rates are acceptable, contact Y. Gotra to turn on SVT and M. Defurne to turn on MVT and FTT; while Yuri will monitor the SVT, increase the beam current to 5 nA | + | * If rates are acceptable, contact Y. Gotra to turn on SVT and M. Defurne to turn on MVT and FTT; while Yuri will monitor the SVT, increase the beam current to 5 nA. |
* Once all detectors are on, record rates in all detectors, and currents in the DC, SVT, and MM, at solenoid field settings of 50%, 60%, 70%, 80%, 90%, and 100%. To do that use the tool described at https://logbooks.jlab.org/entry/3504609 . Make sure that the logbook information is complete and readable! | * Once all detectors are on, record rates in all detectors, and currents in the DC, SVT, and MM, at solenoid field settings of 50%, 60%, 70%, 80%, 90%, and 100%. To do that use the tool described at https://logbooks.jlab.org/entry/3504609 . Make sure that the logbook information is complete and readable! | ||
* At 100% solenoid field, record rates in all detectors, and currents in the DC, SVT, and MM, at beam currents of 5 nA, 15 nA, 25 nA, ... The beam intensity and duration will be established by the beamline expert and the SVT and MM experts. Make sure that the logbook information is complete and readable! | * At 100% solenoid field, record rates in all detectors, and currents in the DC, SVT, and MM, at beam currents of 5 nA, 15 nA, 25 nA, ... The beam intensity and duration will be established by the beamline expert and the SVT and MM experts. Make sure that the logbook information is complete and readable! |
Revision as of 18:13, 14 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Torus : +3770 A (100% field);
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
Run Plan:All studies for the next few shifts will use 100% torus field (negatives bending in); the strength of the solenoid field and the status of the hydrogen target are listed below.
|
General Instructions:
Beam Tuning:
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)
|
Every Shift:
|
Every Run:
|
---|
Webcams |