Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 101: | Line 101: | ||
* Complete FT optimization | * Complete FT optimization | ||
* Complete DC test plan: | * Complete DC test plan: | ||
− | ** Complete DC plateau scan to lower HV values (HV settings | + | ** Complete DC plateau scan to lower HV values (HV settings #6, #7, #8; thresholds of -20 mV, -30 mV, -40 mV) |
** Perform DC HV/threshold study with settings #8, #9, #9 for R1, R2, R3 with thresholds of -20 mV, -30 mV, -30 mV. | ** Perform DC HV/threshold study with settings #8, #9, #9 for R1, R2, R3 with thresholds of -20 mV, -30 mV, -30 mV. | ||
* Continue work on trigger development/optimization. | * Continue work on trigger development/optimization. |
Revision as of 13:16, 19 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Torus : -3770 A (100% field), Solenoid: 2416 A (100% field), full target
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note: If the DC system gives a major gas alarm, turn off the DC high voltage
- Note: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is an issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
Run Plan:
|
General Instructions:
Beam Tuning:
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |
Epics on the web
|