Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 100: | Line 100: | ||
* Work on setting detector thresholds and timing windows | * Work on setting detector thresholds and timing windows | ||
* Take data at 10 nA with the production electron trigger (trigger_electron.trg) with the optimal DC HV and threshold settings. Take data for 8 hours. | * Take data at 10 nA with the production electron trigger (trigger_electron.trg) with the optimal DC HV and threshold settings. Take data for 8 hours. | ||
+ | * Ramp torus down to 85% field (-3204 A) (still negative polarity - negatives outbending) | ||
+ | * Take data at 10 nA with the production electron trigger (trigger_electron.trg). Take data for 4 hours. | ||
* Final task before beam off (6 a.m.): Measure DC occupancy as function of solenoid field. With 1 nA beam measure DC occupancy at 100% (2416 A), 90% (2174 A), 80% (1933 A), 70% (1691 A), 60% (1450 A), and 50% (1208 A) solenoid field. For each setting record DC occupancy from MON12 and DC currents in logbook. | * Final task before beam off (6 a.m.): Measure DC occupancy as function of solenoid field. With 1 nA beam measure DC occupancy at 100% (2416 A), 90% (2174 A), 80% (1933 A), 70% (1691 A), 60% (1450 A), and 50% (1208 A) solenoid field. For each setting record DC occupancy from MON12 and DC currents in logbook. | ||
Revision as of 10:28, 20 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Torus : -3770 A (100% field), Solenoid: 2416 A (100% → 50% field), full target
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note: Keep the HV for DC R2 S2 off (there is a problem with this chamber)
- Note: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is an issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
Run Plan:
|
General Instructions:
Beam Tuning:
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |
Epics on the web
|