− | ''' CLAS12 Engineering Run, | + | ''' CLAS12 Engineering Run, Winter 2018 </font> '''<br> |
''' Beam energy 10.6 GeV (5 pass) '''<br> | ''' Beam energy 10.6 GeV (5 pass) '''<br> | ||
− | ''' <font color="red"> Torus : | + | ''' <font color="red"> Torus : 3770 A (100% field), Solenoid: 2416 A (100% &r), full target</font>''' <br> |
''' Important: Document all your work in the logbook! '''<br> | ''' Important: Document all your work in the logbook! '''<br> | ||
''' Remember to fill in the [https://docs.google.com/spreadsheets/d/1frfBlq51qDXZD6fW5rcRefNXSGdVvdMozKUlAVNoUGc/edit?usp=sharing run list] at the beginning and end of each run (clas12run@gmail.com can fill the run list)'''<br> | ''' Remember to fill in the [https://docs.google.com/spreadsheets/d/1frfBlq51qDXZD6fW5rcRefNXSGdVvdMozKUlAVNoUGc/edit?usp=sharing run list] at the beginning and end of each run (clas12run@gmail.com can fill the run list)'''<br> | ||
Line 86: | Line 86: | ||
<br> | <br> | ||
− | * Note: | + | * Note 1: The FT-Off configuration is presently set up - the FT components should be left off. |
− | * Note: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is an issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions. | + | |
+ | * Note 2: Due to issues with the gas handling system with the MM trackers (BMT and FMT), these components should be left off. | ||
+ | |||
+ | * Note 3: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that at safe levels. | ||
+ | |||
+ | * Note 4: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is an issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions. | ||
{| {{TableStyle1}} | {| {{TableStyle1}} | ||
Line 95: | Line 100: | ||
== <font color=blue>''' Run Plan:'''</font>== | == <font color=blue>''' Run Plan:'''</font>== | ||
− | * | + | * The hall will lock up on Jan. 11 at approximately 4 p.m. and shifts will be staffed in preparation for beam delivery. |
− | * | + | * When the hall is locked up, bring up the torus to 100% field (positive polarity, negatives intending), the solenoid to 100% field (nominal polarity), and the tagger magnet up to its nominal field for 5-pass beam. Hall B Engineering |
− | + | should be called for the torus and solenoid magnet ramping and MCC should be called for the tagger magnet ramping. | |
− | * | + | * The first task when beam is available is to tune the beam to the tagger magnet yoke dump. Follow the instructions under the "Procedures" link on the Run Info wikipage for setting up the beam (see [https://wiki.jlab.org/clas12-run/images/7/74/CLAS12_beamline_commissioning.pdf | instructions for setting up the beam]. The beamline expert should be present for this portion of the run plan. |
− | * | + | * Following beam tuning to the tagger magnet yoke, complete a Moller polarimeter run. The beamline expert should be present for this portion of the run plan. |
− | + | * When the beam tune in the upstream beamline is acceptable, ask MCC to turn off and then degauss the tagger magnet. Begin beam tuning to the Faraday Cup. This work will include harp scans and target scans to find the nominal | |
− | + | beam position. The beamline expert should be present for this portion of the run. Make sure to put screen captures of the main scaler GUI in the logbook. | |
− | + | * When the beam tuning is completed, begin detector turn on with 10 nA of beam on the empty target cell. Turn on the Forward Carriage detectors first (ECAL, FTOF, LTCC, HTCC, RICH) - contacting the subsystem teams to perform | |
− | + | this work. Record rates and current for all detectors in the logbook. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Step #4]. | |
− | + | * Fill the cryotarget following the instructions next to the target computer. Contact Hall B Engineering for any questions. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Step #5]. | |
− | + | * Continue detector turn on now for the DC, CTOF, CND, and SVT - contacting the subsystem teams to perform this work. Record rates and current for all detectors in the logbook. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Step #6]. | |
− | * | + | * Begin initial DAQ and trigger checkout to re-establish the DAQ and basic electron trigger from the Dec. 2017 run. This work will be led by the DAQ and trigger experts. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Step #7]. |
+ | * Work on detector setup optimization steps to set DC readout windows for R1, R2, and R3, and the PMT-based detector TDC readout windows to match the FADC windows. This work will be led by the DAQ expert in conjunction with the | ||
+ | subsystem experts. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Step #8]. | ||
+ | * If necessary complete studies of the DC HV settings and DCRB thresholds. This work will be led by the DC expert. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Step #9]. | ||
+ | * Work on optimizing the electron trigger. This work will be led by the trigger team. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Step #10]. | ||
+ | * Begin solenoid rate studies and luminosity scans with both torus polarities at full torus field. | ||
| valign=top | | | valign=top | |
Revision as of 09:26, 11 January 2018
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 10.6 GeV (5 pass)
Torus : 3770 A (100% field), Solenoid: 2416 A (100% &r), full target
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: The FT-Off configuration is presently set up - the FT components should be left off.
- Note 2: Due to issues with the gas handling system with the MM trackers (BMT and FMT), these components should be left off.
- Note 3: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that at safe levels.
- Note 4: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is an issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
Run Plan:
should be called for the torus and solenoid magnet ramping and MCC should be called for the tagger magnet ramping.
beam position. The beamline expert should be present for this portion of the run. Make sure to put screen captures of the main scaler GUI in the logbook.
this work. Record rates and current for all detectors in the logbook. This work is as specified in the Commissioning Run Plan Step #4.
subsystem experts. This work is as specified in the Commissioning Run Plan Step #8.
|
General Instructions:
Beam Tuning:
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)
|
Every Shift:
|
Every Run:
|
---|