Line 100: | Line 100: | ||
* The hall will lock up on Jan. 11 at approximately 4 p.m. and shifts will be staffed in preparation for beam delivery. | * The hall will lock up on Jan. 11 at approximately 4 p.m. and shifts will be staffed in preparation for beam delivery. | ||
* When the hall is locked up, contact the Hall B Engineering Group to bring up the torus to 100% field (positive polarity, negatives inbending) and the solenoid to 100% field (nominal polarity). Tell MCC to bring the tagger magnet up to its nominal field for 5-pass beam when they are ready. | * When the hall is locked up, contact the Hall B Engineering Group to bring up the torus to 100% field (positive polarity, negatives inbending) and the solenoid to 100% field (nominal polarity). Tell MCC to bring the tagger magnet up to its nominal field for 5-pass beam when they are ready. | ||
− | * The first task when beam is available is to tune the beam to the tagger magnet yoke dump. Follow the instructions under the "Procedures" link on the Run Info wikipage for setting up the beam (see the [https://wiki.jlab.org/clas12-run/images/7/74/CLAS12_beamline_commissioning.pdf instructions] for setting up the beam). The beamline expert should be present for this portion of the run plan. | + | * The first task when beam is available is to tune the beam to the tagger magnet yoke dump. Follow the instructions under the "Procedures" link on the Run Info wikipage for setting up the beam (see the [https://wiki.jlab.org/clas12-run/images/7/74/CLAS12_beamline_commissioning.pdf instructions] for setting up the beam). The beamline expert should be present for this portion of the run plan. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #1]. |
− | * Following beam tuning to the tagger magnet yoke, complete a Moller polarimeter run. The beamline expert should be present for this portion of the run plan. | + | * Following beam tuning to the tagger magnet yoke, complete a Moller polarimeter run. The beamline expert should be present for this portion of the run plan. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #2]. |
− | * When the beam tune in the upstream beamline is acceptable, ask MCC to turn off and then degauss the tagger magnet. Begin beam tuning to the Faraday Cup with 5 nA of beam. This work will include harp scans and target scans to find the nominal beam position. The beamline expert should be present for this portion of the run. Make sure to put screen captures of the main scaler GUI in the logbook. | + | * When the beam tune in the upstream beamline is acceptable, ask MCC to turn off and then degauss the tagger magnet. Begin beam tuning to the Faraday Cup with 5 nA of beam. This work will include harp scans and target scans to find the nominal beam position. The beamline expert should be present for this portion of the run. Make sure to put screen captures of the main scaler GUI in the logbook. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #3]. |
* When the beam tuning is completed, begin detector turn on with 10 nA of beam on the empty target cell. Turn on the Forward Carriage detectors first (ECAL, FTOF, LTCC, HTCC, RICH) - contacting the subsystem teams to perform this work. Record rates and current for all detectors in the logbook. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #4]. | * When the beam tuning is completed, begin detector turn on with 10 nA of beam on the empty target cell. Turn on the Forward Carriage detectors first (ECAL, FTOF, LTCC, HTCC, RICH) - contacting the subsystem teams to perform this work. Record rates and current for all detectors in the logbook. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #4]. | ||
* Fill the cryotarget following the instructions next to the target computer. Contact Hall B Engineering for any questions. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #5]. | * Fill the cryotarget following the instructions next to the target computer. Contact Hall B Engineering for any questions. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #5]. |
Revision as of 14:13, 11 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: The FT-Off configuration is presently set up - the FT components should be left off.
- Note 2: Due to issues with the gas handling system with the MM trackers (BMT and FMT), these components should be left off.
- Note 3: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 4: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
Run Plan:
|
General Instructions:
Beam Tuning:
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)
|
Every Shift:
|
Every Run:
|
---|