Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 98: | Line 98: | ||
* Close up the hall by noon and call MCC to put hall into beam permit. | * Close up the hall by noon and call MCC to put hall into beam permit. | ||
− | * Begin 1-pass program by tuning 10 nA beam to the tagger magnet yoke dump. Follow the beam tuning procedures for Hall B on the run wiki under Procedures. The beamline expert will oversee this work | + | * After the hall is in beam permit: |
− | * When the beam tune is acceptable in the upstream beamline, turn off/degauss the tagger magnet and tune 10 nA beam to the Faraday Cup. The beamline expert will oversee this work. | + | ** Call MCC to power up the tagger magnet to 91.3 A |
+ | ** Power up the solenoid magnet to 100% field (positive polarity) | ||
+ | ** After the solenoid is at full field, power up the torus magnet to -100% field (negative polarity; negatives outbending) | ||
+ | * Before beam delivery to the hall: | ||
+ | ** Make sure all detectors are off (leave DC LV on) | ||
+ | ** Make sure the cryotarget is empty | ||
+ | ** Make sure the beam blocker is out (it will remain out for the duration of the 1-pass running) | ||
+ | * Begin 1-pass program by tuning 10 nA beam to the tagger magnet yoke dump. Follow the beam tuning procedures for Hall B on the run wiki under Procedures. The beamline expert will oversee this work remotely. | ||
+ | * When the beam tune is acceptable in the upstream beamline, turn off/degauss the tagger magnet and tune 10 nA beam to the Faraday Cup. The beamline expert will oversee this work remotely. | ||
* When physics quality beam is established to the Faraday Cup, turn on the forward detectors (ECAL, FTOF, LTCC, HTCC, RICH). Record rates and currents in the logbook. | * When physics quality beam is established to the Faraday Cup, turn on the forward detectors (ECAL, FTOF, LTCC, HTCC, RICH). Record rates and currents in the logbook. | ||
* Fill the cryotarget. | * Fill the cryotarget. |
Revision as of 12:29, 16 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 2.1 GeV (1 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=-0.2 mm, Y=-0.2 mm), 2C24 (X=-0.5 mm, Y=0.9 mm), 2H01 (X=0.5 mm, Y=1.5 mm)
Run Plan:
Beam Tuning:
When ready to get beam, turn all beamline devices ON, turn all CLAS12 detectors OFF |
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|