Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 96: | Line 96: | ||
== <font color=blue>''' Run Plan:'''</font>== | == <font color=blue>''' Run Plan:'''</font>== | ||
− | ''(last update 1/18 - | + | ''(last update 1/18 - 2:30 pm)'' |
* Continue production running at -60% torus (neg. polarity), 100% solenoid (pos. polarity) with the electron trigger set with an energy threshold of 120 MeV and beam current of 3 nA. Check periodically the DAQ live time: this should be around 85%. | * Continue production running at -60% torus (neg. polarity), 100% solenoid (pos. polarity) with the electron trigger set with an energy threshold of 120 MeV and beam current of 3 nA. Check periodically the DAQ live time: this should be around 85%. | ||
* At 1:30 pm leave the DAQ to Ben Raydo and the FT expert to continue FT trigger studies. | * At 1:30 pm leave the DAQ to Ben Raydo and the FT expert to continue FT trigger studies. | ||
* After trigger studies are completed, restart production data taking in the previous conditions. | * After trigger studies are completed, restart production data taking in the previous conditions. | ||
− | * At 9 pm, call the RC to have the solenoid field lowered at -60% and continue production data taking at this setting. Continue production data taking until the morning tomorrow. | + | * At 9 pm, call the RC to have the solenoid field lowered at -60% and continue production data taking at this setting (-60% torus, -60% solenoid. Continue production data taking until the morning tomorrow. |
− | * Physics studies (7 settings) 1 shift per setting: | + | * Physics studies (7 settings) 1 shift per setting: |
− | |||
− | |||
** -60% torus (neg. polarity), -60% solenoid (neg. polarity) | ** -60% torus (neg. polarity), -60% solenoid (neg. polarity) | ||
** 60% torus (pos. polarity), -60% solenoid (neg. polarity) | ** 60% torus (pos. polarity), -60% solenoid (neg. polarity) |
Revision as of 14:49, 18 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 2.1 GeV (1 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Raffaella De Vita
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 5 - 6 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=1.0 mm, Y=-1.0 mm)
Run Plan:(last update 1/18 - 2:30 pm)
Beam Tuning:
When ready to get beam, turn all beamline devices ON, turn all CLAS12 detectors OFF |
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|