Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 110: | Line 110: | ||
** Make sure beam positions are consistent with last used values. Check the detector, halo counter and BOM rates on full target. Use FTCAL scalers to check the beam centering. Make logbook entries with snapshots of the overview epics gui and other relevant graph. | ** Make sure beam positions are consistent with last used values. Check the detector, halo counter and BOM rates on full target. Use FTCAL scalers to check the beam centering. Make logbook entries with snapshots of the overview epics gui and other relevant graph. | ||
* Once fields and target are restored, take data: | * Once fields and target are restored, take data: | ||
− | ** 1h or 50 M event with random_2gev_lt.trg trigger: 30-40 min. before starting the run, call Rafayel Paremuzyan, 757 753 7769, he will | + | ** 1h or 50 M event with random_2gev_lt.trg trigger: 30-40 min. before starting the run, call Rafayel Paremuzyan, 757 753 7769, he will come in to check the DAQ settings are correct and all data for trigger studies are being recorded correctly. |
** lower the current to 2 nA and continue data taking with tr_electron_2gev_lt.trg: monitor trigger scalers and monitoring histograms (mon12) to ensure all trigger bits are properly recorded and all detectors are properly readout (compare to previous monitoring plots). | ** lower the current to 2 nA and continue data taking with tr_electron_2gev_lt.trg: monitor trigger scalers and monitoring histograms (mon12) to ensure all trigger bits are properly recorded and all detectors are properly readout (compare to previous monitoring plots). | ||
** Take 2 hours runs. Monitor routinely trigger scalers, live time, monitoring histograms, CED, detector scalers. | ** Take 2 hours runs. Monitor routinely trigger scalers, live time, monitoring histograms, CED, detector scalers. |
Revision as of 23:22, 20 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 2.1 GeV (1 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Raffaella De Vita
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.7 mm, Y=-0.5 mm)
Run Plan:(last update 1/20 - 8:30 pm)
Beam Tuning:
When ready to get beam, turn all beamline devices ON, turn all CLAS12 detectors OFF |
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|