Line 96: | Line 96: | ||
== <font color=blue>''' Run Plan:'''</font>== | == <font color=blue>''' Run Plan:'''</font>== | ||
− | ''(last update 1/21 - | + | ''(last update 1/21 - 10:00 am)'' |
− | * | + | * Data taking at torus -60% field (negatives outbending) and solenoid to -60% field: |
− | ** | + | ** 2 nA beam current on LH2 target, Trigger is trg_electron_2GeV_lt.trg, beam position as indicated above; |
− | ** | + | ** Take 2 hours runs. Monitor routinely trigger scalers, live time, monitoring histograms, CED, detector scalers. |
+ | * Continue until 2pm, when the DAQ expert, S. Boiarino, will start DAQ/trigger studies to check and optimize a special trigger to detect forward-going protons in coincidence with elastic in the central. | ||
+ | * Trigger studies should be completed by 6 pm: at that time, the solenoid will be ramped to -100% (RC or PDL will do it). | ||
+ | * Data taking at torus -60% field (negatives outbending) and solenoid to -100% field: | ||
+ | ** 2 nA beam current on LH2 target, Trigger is trg_electron_2GeV_lt.trg, beam position as indicated above; | ||
+ | ** Take 2 hours runs. Monitor routinely trigger scalers, live time, monitoring histograms, CED, detector scalers. | ||
+ | * Continue data taking until 5:30 am when beam will be off for accelerator maintenance. | ||
+ | * At that time, call E. Pasyuk (PDL phone) to start ramping down the torus. | ||
+ | * Around 7am, the Hall will be brought to controlled access and surveyed. The Hall will stay in controlled access till 2 pm to allow maintenance work. | ||
+ | * Once work in the Hall is complete, ramp the solenoid up to -100% (RC or PDL will do it). Once solenoid is at field, ramp torus to +60% (inbending electrons). | ||
+ | * Ask to go to beam permit and prepare to re-establish beam following the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf] | ||
+ | * Once beam is tuned to the FC, start data taking at 60% field (negatives inbeding) and solenoid to -60% field: | ||
+ | ** 5 nA beam current on LH2 target, Trigger is trg_electron_2GeV_lt.trg, beam position as indicated above; | ||
** Take 2 hours runs. Monitor routinely trigger scalers, live time, monitoring histograms, CED, detector scalers. | ** Take 2 hours runs. Monitor routinely trigger scalers, live time, monitoring histograms, CED, detector scalers. | ||
− | |||
− | |||
− | |||
− | |||
Revision as of 10:36, 21 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 2.1 GeV (1 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Raffaella De Vita
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.7 mm, Y=-0.5 mm)
Run Plan:(last update 1/21 - 10:00 am)
Beam Tuning:
When ready to get beam, turn all beamline devices ON, turn all CLAS12 detectors OFF |
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|