Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 98: | Line 98: | ||
''(last update 1/21 - 10:00 am)'' | ''(last update 1/21 - 10:00 am)'' | ||
− | * Data taking at torus -60% field (negatives outbending) and solenoid to -60% field: | + | * <s>Data taking at torus -60% field (negatives outbending) and solenoid to -60% field: |
** 2 nA beam current on LH2 target, Trigger is trg_electron_2GeV_lt.trg, beam position as indicated above; | ** 2 nA beam current on LH2 target, Trigger is trg_electron_2GeV_lt.trg, beam position as indicated above; | ||
** Take 2 hours runs. Monitor routinely trigger scalers, live time, monitoring histograms, CED, detector scalers. | ** Take 2 hours runs. Monitor routinely trigger scalers, live time, monitoring histograms, CED, detector scalers. | ||
* Continue until 2pm, when the DAQ expert, S. Boiarino, will start DAQ/trigger studies to check and optimize a special trigger to detect forward-going protons in coincidence with elastic in the central. | * Continue until 2pm, when the DAQ expert, S. Boiarino, will start DAQ/trigger studies to check and optimize a special trigger to detect forward-going protons in coincidence with elastic in the central. | ||
− | * Trigger studies should be completed by 6 pm: at that time, the solenoid will be ramped to -100% (RC or PDL will do it). | + | * Trigger studies should be completed by 6 pm: at that time, the solenoid will be ramped to -100% (RC or PDL will do it).</s> |
* Data taking at torus -60% field (negatives outbending) and solenoid to -100% field: | * Data taking at torus -60% field (negatives outbending) and solenoid to -100% field: | ||
** 2 nA beam current on LH2 target, Trigger is trg_electron_2GeV_lt.trg, beam position as indicated above; | ** 2 nA beam current on LH2 target, Trigger is trg_electron_2GeV_lt.trg, beam position as indicated above; |
Revision as of 19:07, 21 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 2.1 GeV (1 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Raffaella De Vita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.7 mm, Y=-0.5 mm)
Run Plan:(last update 1/21 - 10:00 am)
Beam Tuning:
When ready to get beam, turn all beamline devices ON, turn all CLAS12 detectors OFF |
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|