Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 107: | Line 107: | ||
** Special Run #2 (Random): 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file random_tr.trg (selected at the Download), beam position as indicated above. Take one hour of data. | ** Special Run #2 (Random): 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file random_tr.trg (selected at the Download), beam position as indicated above. Take one hour of data. | ||
** Special Run #3 (DC HV scan): 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron_2gev_lt.trg (selected at the Download), beam position as indicated above; take 3 short runs (20 min.) with different DC HV settings (7,8,8), (9,10,10), (10,11,11) as detailed in https://logbooks.jlab.org/entry/3519236. Once completed, set DC HV at the nominal settings (8,9,9). | ** Special Run #3 (DC HV scan): 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron_2gev_lt.trg (selected at the Download), beam position as indicated above; take 3 short runs (20 min.) with different DC HV settings (7,8,8), (9,10,10), (10,11,11) as detailed in https://logbooks.jlab.org/entry/3519236. Once completed, set DC HV at the nominal settings (8,9,9). | ||
− | ** | + | ** Production: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron_2gev_lt.trg (selected at the Download), beam position as indicated above; Take 2 hours runs till 7 am. |
− | ** | + | ** Special Run #4 (MIPS): at 7 am, 2 nA beam current on LH2 target, DAQ configuration PROD2 (selected by clicking on Configure before the Download), trigger file trg_mips_PCAL.trg (selected at the Download), beam position as indicated above; adjust the beam current to have a trigger rate not greater than 15 kHz and live time not less than 50%); take one hour of data. |
* While taking data, monitor routinely trigger scalers (make sure all bits in the first column of the table are non-zero, see https://logbooks.jlab.org/entry/3518829 as an example), live time, monitoring histograms, CED, detector scalers. | * While taking data, monitor routinely trigger scalers (make sure all bits in the first column of the table are non-zero, see https://logbooks.jlab.org/entry/3518829 as an example), live time, monitoring histograms, CED, detector scalers. | ||
Revision as of 20:46, 23 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 2.1 GeV (1 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Raffaella De Vita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.7 mm, Y=-0.5 mm)
Run Plan:(last update 1/22 - 18:00 am)
Beam Tuning:
When ready to get beam, turn all beamline devices ON, turn all CLAS12 detectors OFF |
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|