Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 98: | Line 98: | ||
''(last update 1/24 - 10:00 am)'' | ''(last update 1/24 - 10:00 am)'' | ||
− | * | + | * Recover solenoid and torus magnets after ESR compressor crash. Ramp solenoid to 60% field (positive polarity) and torus to 60% field (positive polarity). |
− | * | + | ** Due to concerns related to internal forces on the solenoid, the magnet engineers should be contacted before ramping the solenoid. |
− | * | + | * Recover the cryotarget and fill the cell. |
− | * | + | * Ask MCC to ramp the tagger magnet up to prepare for beam tuning. |
− | * | + | * When MCC will inform you that they are ready to send beam, turn most sensitive detectors off including trackers (SVT, MVT, FTT, DC), Central Detectors (CTOF, CND) and RICH: refer to the manuals or call the experts for any questions. |
+ | * Prepare to re-establish beam following the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Consult with the beamline expert in case of issues. | ||
+ | * Once beam is tuned to the FC, switched all detectors on. Call the SVT expert to switch the SVT on. Restore DC HV setting to be (8,9,9) for Region 1, 2 and 3, respectively. Make sure that the voltage for all channels comes up at the set values and no channels are off. | ||
* Make sure FSD thresholds are set correctly for the specific beam current used in the following runs. | * Make sure FSD thresholds are set correctly for the specific beam current used in the following runs. | ||
− | * Start data taking at 60% field (negatives inbending) and solenoid to | + | * Start data taking at 60% field (negatives inbending) and solenoid to 60% field: |
− | ** | + | ** Test production run: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron_2gev_lt.trg (selected at the Download), beam position as indicated above; Take 30 min of data. Record trigger scaler gui. |
** Test production run: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; Take 30 min of data. Record trigger scaler gui. | ** Test production run: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; Take 30 min of data. Record trigger scaler gui. | ||
** Special Run #1 (Random): 10 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file random_2gev_lt.trg (selected at the Download), beam position as indicated above; call Rafayel Paremuzyan (757-753-7769) one hour before starting the run, as he will come to the Counting house or connect remotely to check that settings are correct and all trigger information written to the data stream. Take 50 M events. | ** Special Run #1 (Random): 10 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file random_2gev_lt.trg (selected at the Download), beam position as indicated above; call Rafayel Paremuzyan (757-753-7769) one hour before starting the run, as he will come to the Counting house or connect remotely to check that settings are correct and all trigger information written to the data stream. Take 50 M events. |
Revision as of 23:07, 24 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 2.1 GeV (1 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Raffaella De Vita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.7 mm, Y=-0.5 mm)
Run Plan:(last update 1/24 - 10:00 am)
|
General Instructions:
Every Shift:
Every Run:
|