Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 108: | Line 108: | ||
* Make sure FSD thresholds are set correctly for the specific beam current used in the following runs. | * Make sure FSD thresholds are set correctly for the specific beam current used in the following runs. | ||
* Start data taking at 60% field (negatives inbending) and solenoid to 60% field: | * Start data taking at 60% field (negatives inbending) and solenoid to 60% field: | ||
− | ** Test production run: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron_2gev_lt.trg (selected at the Download), beam position as indicated above; Take | + | ** Test production run: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron_2gev_lt.trg (selected at the Download), beam position as indicated above; Take 60 min of data. Record trigger scaler gui. |
− | ** Test production run: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; Take | + | ** Test production run: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; Take 60 min of data. Record trigger scaler gui. |
− | ** Special Run #1 | + | ** Special Run #1 (DC HV scan): 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; take 3 short runs (20 min.) with different DC HV settings (7,8,8), (9,10,10), (10,11,11) as detailed in https://logbooks.jlab.org/entry/3519236. Every time the HV settings are changed use the DC HV Monitoring GUI (from the main Epics GUI select DC-> DC HV Monitoring) to check that the HV settings are correct; compare the values displayed in the GUI with what reported in the table on pg. 5 and 6 of the DC manual at [https://clasweb.jlab.org/wiki/images/b/b2/Drift-chamber-operating-procedure.pdf]; take a snapshot of the DC HV monitoring gui and save it to the logbook. '''Once completed, set DC HV at the nominal settings (8,9,9)'''. |
− | + | ** Special Run #2 (Random): 10 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file random_2gev_lt.trg (selected at the Download), beam position as indicated above; call Rafayel Paremuzyan (757-753-7769) one hour before starting the run, as he will come to the Counting house or connect remotely to check that settings are correct and all trigger information written to the data stream. Take 50 M events. | |
− | + | ** Special Run #3 (Random): 10 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file random_tr.trg (selected at the Download), beam position as indicated above. Take 50 M events. | |
** Production: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; Take 2 hours runs till 7 am. | ** Production: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; Take 2 hours runs till 7 am. | ||
** Special Run #4 (MIPS): at 7 am, 2 nA beam current on LH2 target, DAQ configuration PROD2 (selected by clicking on Configure before the Download), trigger file trg_mips_PCAL.trg (selected at the Download), beam position as indicated above; adjust the beam current to have a trigger rate not greater than 15 kHz and live time not less than 50%); take one hour of data. | ** Special Run #4 (MIPS): at 7 am, 2 nA beam current on LH2 target, DAQ configuration PROD2 (selected by clicking on Configure before the Download), trigger file trg_mips_PCAL.trg (selected at the Download), beam position as indicated above; adjust the beam current to have a trigger rate not greater than 15 kHz and live time not less than 50%); take one hour of data. |
Revision as of 04:09, 25 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 2.1 GeV (1 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Raffaella De Vita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.7 mm, Y=-0.5 mm)
Run Plan:(last update 1/24 - 11:00 pm)
|
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|