Line 98: | Line 98: | ||
''(last update 1/24 - 11:00 pm)'' | ''(last update 1/24 - 11:00 pm)'' | ||
− | * Continue data taking at 60% field (negatives inbending) and solenoid to 60% field: | + | *<s> Continue data taking at 60% field (negatives inbending) and solenoid to 60% field: |
** Production: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; Take 2 hours runs until 5 pm. | ** Production: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; Take 2 hours runs until 5 pm. | ||
* At 5pm, empty the target and take a run in the same configuration as before until beam will be terminated for the pass change to 10.6 GeV. | * At 5pm, empty the target and take a run in the same configuration as before until beam will be terminated for the pass change to 10.6 GeV. | ||
* While taking data, monitor routinely trigger scalers (make sure all bits in the first column of the table are non-zero, see https://logbooks.jlab.org/entry/3518829 as an example), live time, monitoring histograms, CED, detector scalers. | * While taking data, monitor routinely trigger scalers (make sure all bits in the first column of the table are non-zero, see https://logbooks.jlab.org/entry/3518829 as an example), live time, monitoring histograms, CED, detector scalers. | ||
* When the pass change will start: | * When the pass change will start: | ||
− | * Ask MCC to ramp the tagger magnet up to prepare for beam tuning. | + | ** Ask MCC to ramp the tagger magnet up to prepare for beam tuning. |
− | * Contact the RC to ramp the solenoid | + | ** Contact the RC to ramp the solenoid to full field. |
− | * Before asking for beam, turn sensitive detectors off including trackers (SVT, MVT, FTT, DC), Central Detectors (CTOF, CND), FTOF and RICH: refer to the manuals or call the experts for any questions. | + | ** Before asking for beam, turn sensitive detectors off including trackers (SVT, MVT, FTT, DC), Central Detectors (CTOF, CND), FTOF and RICH: refer to the manuals or call the experts for any questions.</s> |
* Prepare to re-establish beam following the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Refer to the 10.6 GeV harp scans of January 12 (https://logbooks.jlab.org/entry/3511621, https://logbooks.jlab.org/entry/3511611). Call the beamline expert when you have beam on the tagger yoke. | * Prepare to re-establish beam following the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Refer to the 10.6 GeV harp scans of January 12 (https://logbooks.jlab.org/entry/3511621, https://logbooks.jlab.org/entry/3511611). Call the beamline expert when you have beam on the tagger yoke. | ||
* Once beam tuning to the tagger yoke is complete and before degaussing the tagger magnet, perform Moller runs as established by the beamline expert. | * Once beam tuning to the tagger yoke is complete and before degaussing the tagger magnet, perform Moller runs as established by the beamline expert. | ||
Line 112: | Line 112: | ||
* Make sure FSD thresholds are set correctly for the specific beam current used in the following runs, integration time is set to 5 ms, and that the orbit locks are on. | * Make sure FSD thresholds are set correctly for the specific beam current used in the following runs, integration time is set to 5 ms, and that the orbit locks are on. | ||
* Once beam is tuned to the FC, switched all detectors on. Call the SVT expert to switch the SVT on. Restore DC HV setting to be (8,9,9) for Region 1, 2 and 3, respectively. Make sure that the voltage for all channels comes up at the set values and no channels are off. | * Once beam is tuned to the FC, switched all detectors on. Call the SVT expert to switch the SVT on. Restore DC HV setting to be (8,9,9) for Region 1, 2 and 3, respectively. Make sure that the voltage for all channels comes up at the set values and no channels are off. | ||
+ | * When hall C target cooldown is complete, call the RC to ramp the torus to full field. | ||
* Start an empty target run: DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; consult with the RC to establish the appropriate beam current. Take 2 hours runs. | * Start an empty target run: DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; consult with the RC to establish the appropriate beam current. Take 2 hours runs. | ||
Revision as of 19:49, 25 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 2.1 GeV (1 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Raffaella De Vita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.7 mm, Y=-0.5 mm)
Run Plan:(last update 1/24 - 11:00 pm)
|