Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 96: | Line 96: | ||
== <font color=blue>''' Run Plan:'''</font>== | == <font color=blue>''' Run Plan:'''</font>== | ||
− | ''(last update 1/ | + | ''(last update 1/26 - 5:00 pm)'' |
− | * | + | * Continue data taking for trigger studies at 100% torus field (negatives inbending) and solenoid to 100% field. DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file will change depending on the specif test (selected at the Download), beam position as indicated above. Select the beam current to have a trigger rate <12-13 KHZ up to a maximum of 30 nA. For each selected current, make sure FSD thresholds are set correctly (refer to the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]), integration time is set to 5 ms, and that the orbit locks are on. |
− | + | ** Trigger study #1: trigger file tr_electron.trg, 1 h run. | |
− | + | ** Trigger study #2: trigger file elec_pcal_xxx.trg with xxx = 200, 300, 400, 20 min. or 10M event runs. | |
− | + | ** Trigger study #3: trigger file tr_pcal_100.trg, 1 h run or 20M events. | |
− | + | ** Trigger study #4: trigger file htcc_7phe.trg, 1 h run or 20M events. | |
− | + | ** Trigger study #5: trigger file elec_htcc_xphe_pcal_300.trg with x=1,3,5, 20 min. or 10M events runs. | |
− | + | ** Trigger study #6: trigger file random_tr.trg, take data for 5 hours. | |
− | |||
− | |||
− | * | ||
− | * | ||
− | * | ||
− | * | ||
− | |||
− | * | ||
− | * | ||
<!-- == <font color=blue>''' Beam Tuning:'''</font>== | <!-- == <font color=blue>''' Beam Tuning:'''</font>== |
Revision as of 16:59, 26 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Raffaella De Vita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.3 mm, Y=0.0 mm)
Run Plan:(last update 1/26 - 5:00 pm)
|
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|
Hall-B |
Accelerator |
Bluejean meetings |