Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 96: | Line 96: | ||
== <font color=blue>''' Run Plan:'''</font>== | == <font color=blue>''' Run Plan:'''</font>== | ||
− | ''(last update 1/27 - | + | ''(last update 1/27 - 6:00 pm)'' |
− | * Continue data taking | + | * Continue data taking at 100% torus field (negatives inbending) and solenoid to 100% field. DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file elec_htcc_1phe_pcal_300.trg (selected at the Download), beam position as indicated above. Make sure FSD thresholds are set correctly (refer to the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]), integration time is set to 5 ms, and that the orbit locks are on. |
− | ** | + | ** 75 nA: 2 h run |
− | + | * At 7 pm, the FT expert will take half an hour to test different HV settings on the FTHodo; | |
− | + | * At 7:30 pm, the DAQ expert will test new threshold settings on DC R2 to suppress the electronic noise; | |
− | * | + | * Once these tests are complete, continue data taking with elec_htcc_1phe_pcal_300.trg: |
− | + | ** 50 nA: 3 h run until 12 am | |
− | * | + | ** 25 nA: until 8 am |
− | * Once | + | ** From 8 pm to 12 pm: the RICH expert will take special runs at fixed current (50 nA) and with the same trigger as before but changing RICH operating parameters |
− | * | ||
− | * | ||
− | * | ||
Revision as of 18:31, 27 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Raffaella De Vita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.3 mm, Y=0.0 mm)
Run Plan:(last update 1/27 - 6:00 pm)
|