Run Group M
Shift ScheduleESAD, COO, RSAD Read before shift!!!Shift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[10 digit number]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group M, Fall 2021
Beam energies: 2.1, 4.0, 6.0 GeV (1.96 GeV/pass)
Important: Document all your work in the logbook!
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
- stepanya@jlab.org
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
- vpk@jlab.org
Run Plan: Nov 10 - 12 2021
Hall Access Items (Wednesday, November 3rd):DAQ configurationPROD66 , production trigger rgm_6GeV_inb_v1_0.trg
Shift Worker Notes:In case of other questions or uncertainties of what to do, call the RC or PDL Every Run: Log screenshots of: (this is for the remote shifter)
References and Standards:(last update 1/14/2020- 23:20) Nominal Beam Positions
FSD Thresholds
Reference Harp Scans for Beam on Faraday Cup: 2C21 [2], 2C24 (tagger harp) [3], 2H01 [4] Reference Harp Scans for Beam on Tagger dump: 2C21 [5], 2C24 (tagger harp) [6] Reference Monitoring Histograms (40 nA, production trigger) [7] Counter rates
Beamline vacuum: should be not higher than 5e-5.
|
General Instructions:
Every Shift:
Every Run: Log screenshots of: (this is for the remote shifter, see dedicated tab above.)
|