Difference between revisions of "Meeting 8 May 2020"
Jump to navigation
Jump to search
(3 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
* Shielding and magnet model CAD (Josh) | * Shielding and magnet model CAD (Josh) | ||
::* [https://wiki.jlab.org/cuawiki/images/d/d2/CPS_Initial_Design_Model.pptx CPS Initial Design Model] | ::* [https://wiki.jlab.org/cuawiki/images/d/d2/CPS_Initial_Design_Model.pptx CPS Initial Design Model] | ||
− | * Hall A/C model and design/implementation (Steven, Mike, Paulo) | + | * [https://wiki.jlab.org/cuawiki/images/8/84/CPS_Positions.pptx Hall A/C model and design/implementation] (Steven, Mike, Paulo) |
* NPS+CPS experiments | * NPS+CPS experiments | ||
Line 54: | Line 54: | ||
::::* cooling, forces, services to magnet etc. | ::::* cooling, forces, services to magnet etc. | ||
::::* outer containment for tungsten and poly - container to hold tungsten (stainless steel typically since it is heavy) | ::::* outer containment for tungsten and poly - container to hold tungsten (stainless steel typically since it is heavy) | ||
− | * Division of W-Cu insert should minimize heat transfer between segments | + | ::* Division of W-Cu insert should minimize heat transfer between segments |
− | * Discussion of best way to interface with engineering/design team | + | ::* Discussion of best way to interface with engineering/design team |
− | ::* Autodesk Inventor - should be able to transfer files | + | ::::* Autodesk Inventor - should be able to transfer files |
* '''Action Items''' - to address before turning over to engineering/design team | * '''Action Items''' - to address before turning over to engineering/design team | ||
::* Cu-W inserts | ::* Cu-W inserts | ||
− | ::* Form of W blocks - get information from vendor | + | ::* Form of W blocks - get information from vendor |
::* Container for W blocks | ::* Container for W blocks | ||
Line 70: | Line 70: | ||
* There are interferences - need to further discuss | * There are interferences - need to further discuss | ||
− | * '''Action item:''' make ppt slides with screen shots | + | * '''Action item:''' make ppt slides with screen shots - DONE (see link under Discussion items) |
Latest revision as of 09:07, 11 May 2020
DISCUSSION POINTS
- Simulations conclusions, updates, and next phase
- Shielding and magnet model CAD (Josh)
- Hall A/C model and design/implementation (Steven, Mike, Paulo)
- NPS+CPS experiments
- Other
PARTICIPANTS:
Hamlet Mkrtchyan, Igor, Mike Fowler, Sean Dobbs, Tanja Horn, Paulo Medeiros, Mike CAD, Steven Lassiter, Vardan Tadevosyan, Vladimir Berdnikov, Marie Boer, Rolf Ent, Gabriel Niculescu, Dustin Keller, Donal Day, A Comer
SUMMARY NOTES
RADIATION SIMULATIONS UPDATE (Gabriel)
- Conclusion: we are "there" - Picked configuration mk_V
- No need for pink plastic in front - keep lead there
- Air in exit channel - important to pump, since would give radiological gases
- Need gate valve and window to separate scattering chamber from beam line (simulation has entrance window)
CONCLUSIONS: BRIDGING SIMULATION AND MECHANICAL DESIGN (Rolf, Josh, Tanja)
SUMMARY OF CONCLUSIONS AND SHIELDING SKETCHES
- Listing of radiation and material for mk_V
- Seems to suggest ~50 ton device
- Sketches of shielding configuration: side view, front view (how many bricks there are and how to stack them) - start at z=+5cm and estimate total height (155cm), width (180cm) and length (~200cm)
- Hall D KLong possible configuration
- Position magnet with respect to beam - narrow beam pipe hole (3mm), so need very accurate positioning
- Perhaps change beam pipe to have tolerance on all sides
- Mainly need good beam position - need to be able to align to better than 1mm
INITIAL CAD MODEL OF MAGNET AND SHIELDING
- Magnet pole piece is angled to increase the field
- Note: no field clamp needed for CPS magnet
- Shielding model is still simplified - see action items below
- Next steps:
- Need to also take into account the assembly - which piece goes in first, plus:
- cooling, forces, services to magnet etc.
- outer containment for tungsten and poly - container to hold tungsten (stainless steel typically since it is heavy)
- Division of W-Cu insert should minimize heat transfer between segments
- Discussion of best way to interface with engineering/design team
- Autodesk Inventor - should be able to transfer files
- Action Items - to address before turning over to engineering/design team
- Cu-W inserts
- Form of W blocks - get information from vendor
- Container for W blocks
CPS IN HALL C MODEL PRESENTATION (Mike)
- Discussion of the Hall C model including the CPS
- There are interferences - need to further discuss
- Action item: make ppt slides with screen shots - DONE (see link under Discussion items)
NPS+CPS EXPERIMENTS (Marie, Dustin, Vardan)
- Ongoing simulation efforts
- Background studies with pi+/pi- generator
- Plan to run several settings to optimize signal/background
NEXT MEETING: FRIDAY 29 MAY AT 11:00AM (ET)